Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Survei awal kesiapan kontraktor di Surabaya dalam menerapkan "Time Impact Analysis"
Author
Winarto, Ivan Suryawan
Additional Author(s)
Kurniawan
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Program Studi Teknik Sipil UK Petra, 2016
Language
Indonesian
ISBN
-
Series
Skripsi No. 21012111/SIP/2016
Subject(s)
CONTRUCTION INDUSTRY-MANAGEMENT
PROJECT MANAGEMENT
Notes
. Bibliography: p. 48-49 .
Abstract
-
Physical Dimension
Number of Page(s)
xv, 49 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02678/16
(T) SIP 2111
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Kajian metode takt time pada proyek konstruksi
Analisis pemilihan kontaktor dalam mencapai kinerja proyek
Project management
Manajemen risiko bidang operasional pada readymix concrete
Faktor-faktor yang berperanan dalam penentuan kompensasi pekerja bangunan pada peusahaan kontraktor kelas A di Surabaya yang bergerak di bidang pembangunan gedung
Faktor-faktor yang mempengaruhi sub-kontraktor untuk mengikuti tender dan menentukan nilai mark-up
Pengaruh dari faktor-faktor yang berperan dalam pemilihan project delivery system di Surabaya
The power of design-build