Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Evaluasi dan analisa jadwal pada pelaksanaan pekerjaan struktur proyek konstruksi (studi kasus proyek 'X')
Author
Iskandar, Anthony
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Jurusan Teknik Sipil Universitas Kristen Petra, 2013
Language
Indonesian
ISBN
-
Series
Skripsi No. 21011886/SIP/2012
Subject(s)
BRIDGE CONSTRUCTION INDUSTRY
PROJECT MANAGEMENT
Notes
Appendix : p. 126 - 150
Bibliography : p. 124 / 125
Abstract
-
Physical Dimension
Number of Page(s)
xvii, 150 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00907/13
(T) 658.404 Isk E
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Penerapan material requirement planning pada suatu proyek konstruksi
Peranan kepemimpinan mandor dalam meningkatkan kualitas hasil produksi
Antisipasi kontraktor menghadapi faktor-faktor resiko pada kontrak lumpsum (studi kasus pada perusahaan kontraktor PT Rancang Bangun Sarana)
Project management
Analisis unsafe act dan unsafe condition pada proyek pembangunan gedung x
Studi tentang peran pemangku kepentingan terhadap kerberhasilan bangunan hijau
Analisa kepuasan pengembang terhadap kualitas konstruksi pada perumahan kelas menengah di Surabaya
Pengaruh dari faktor-faktor yang berperan dalam pemilihan project delivery system di Surabaya