Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Evaluasi dan analisa jadwal pada pelaksanaan pekerjaan struktur proyek konstruksi (studi kasus proyek 'X')
Author
Iskandar, Anthony
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Jurusan Teknik Sipil Universitas Kristen Petra, 2013
Language
Indonesian
ISBN
-
Series
Skripsi No. 21011886/SIP/2012
Subject(s)
BRIDGE CONSTRUCTION INDUSTRY
PROJECT MANAGEMENT
Notes
Appendix : p. 126 - 150
Bibliography : p. 124 / 125
Abstract
-
Physical Dimension
Number of Page(s)
xvii, 150 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00907/13
(T) 658.404 Isk E
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Identifikasi faktor-faktor penentu dalam pengadaan dan pemilihan Ruko di Surabaya
Developing a web-based project management system for DEA B.V
IT project management
Identifying and managing project risk
Analisa faktor-faktor yang mempengaruhi perencanaan durasi aktifitas dalam proyek koonstruksi
Prefabrication dan modular construction serta pengaruh precast terhadap scheduling proyek
Studi banding macam-macam denda keterlambatan penyelesaian proyek konstruksi
Project Professional 2010