Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Penggunaan spreadsheet untuk pengendalian biaya pada proyek "rumah-toko"
Author
Erwanto S., Hadi
Additional Author(s)
Hadi Erwanto
Publisher
Surabaya: 2002
Language
Indonesian
ISBN
-
Series
Tesis 054/MTS
Subject(s)
BUILDING-ESTIMATES
CONSTRUCTION INDUSTRY-MANAGEMENT
CONSTRUCTION INDUSTRY-RESEARCH
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
xii, 77 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00176/03
(T2) 692.5 Erw P
-
Unavailable : Removed
Similar Collection
by author or subject
Penggunaan spreadsheet untuk pengendalian biaya pada proyek "rumah-toko"
Determining contractor selection criteria based in project types and project objectives
Metode gabungan critical path method dan line of balance dan penerapannya pada proyek perumahan yang berulang
Pengaruh beberapa faktor budaya Bali terhadap motivasi kerja pekerja konstruksi, dan perbedaannya pada beberapa proyek di Denpasar
Studi mengenai faktor-faktor yang dapat meningkatkan produktivitas konstruksi di Surabaya
Approximate cost estimate berdasarkan kandungan besi dan kebutuhan bekisting pada struktur beton bertulang bangunan ruko (SOHO)
Analisa frekuensi dan penyebab change order pada proyek apartemen di Surabaya
Construction planning and scheduling