Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Analisa penyebab lonjakan manhours ratio pada proses fabrikasi piping dan blasting painting di PT. Gunanusa Utama Fabricators
Author
Gontoro, Ricky
Additional Author(s)
Limongan, Albert
Publisher
Surabaya: Fakultas Teknologi Industri Jurusan Industri UK Petra, 2008
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.02041285/IND/2008
Subject(s)
PRODUCTION MANAGEMENT
Notes
Appendix: p. 359 - 392
Bibliography: p. 358
Abstract
-
Physical Dimension
Number of Page(s)
xxvii, 392 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02988/08
(T) - 658.51 Gon A
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Peningkatan jaminan kualitas assembly line TR di PT Toyota Motor Manufacturing Indonesia
Managing business process flows
LKP : PT Wijaya Indonesia Makmur Bicycle Industries
LKP : CV Dwi Jaya
Perancangan manajemen energi gedung perkantoran di PT Kerta Rajasa Raya
Manajemen produksi/operasi
Perbaikan ergonomi untuk pekerjaan manual pada welding line di PT. Toyota Motor Manufacturing Indonesia
LKP: penyusunan material requirement planning di PT Aditya Angkasa Rungkut