Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Analisa penyebab lonjakan manhours ratio pada proses fabrikasi piping dan blasting painting di PT. Gunanusa Utama Fabricators
Author
Gontoro, Ricky
Additional Author(s)
Limongan, Albert
Publisher
Surabaya: Fakultas Teknologi Industri Jurusan Industri UK Petra, 2008
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.02041285/IND/2008
Subject(s)
PRODUCTION MANAGEMENT
Notes
Appendix: p. 359 - 392
Bibliography: p. 358
Abstract
-
Physical Dimension
Number of Page(s)
xxvii, 392 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02988/08
(T) - 658.51 Gon A
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
SPC
Pengoptimalan bahan baku untuk produksi bola dengan metode experiment design di PT. Asia Pramulia
Perancangan modul sebagai tools dalam penerapan hpwt di PT "X"
Perancangan alat ukur penilain kinerja di PT X dengan menggunakan balanced scorecard
Perancangan sistem perencanaan dan pengendalian produksi di PT. Wim Cycle
Pengukuran kinerja perusahaan distributor kabel menggunakan metode balanced scorecard
Perhitungan dan upaya peningkatan output rate di PT. X
Making a success in manufacturing