Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Orchid mechanical parts a pilot project for tooling monitoring system at PT Schneider Electric manufacturing Batam
Author
Anggraeni, Ratna
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Jurusan Industri UK Petra, 2008
Language
English
ISBN
-
Series
Tugas Akhir No.01041301/IND/2008
Subject(s)
PLANT MAINTENANCE
PLANT ENGINEERING
Notes
Appendix : p. 59 - 112
Bibliography : p. 58
Abstract
-
Physical Dimension
Number of Page(s)
xii, 112 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
03000/08
(T) - 658.202 Ang O
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Perencanaan penjadualan perawatan mesin di PT Soponyono
Penjadwalan perawatan mesin-mesin produksi pada unit 2A (televisi) di PT. Panggung Electric Corporation
Perancangan sistem perawatan mesin produksi dengan mempertimbangkan faktor biaya di PT Sri Intan Toki Industri
Advanced maintenance modelling for asset management
Perancangan sistem planned maintenance di PT X
Perancangan ulang tata letak finished goods dan packing material di PT. Smart corporation
Maintenance benchmarking and best practices
Upaya peningkatan sistem maintenance di departemen one way packaging PT. SS