Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Penurunan waktu dandori dan standarisasi kerja di Plant PI-GS area 7 dan 8 PT Astra Otoparts Divisi Adiwira Plastik
Author
Hariyanto, Tjin Hendri Kristian
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Jurusan Industri UK Petra, 2009
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.01041369/IND/2009
Subject(s)
PRODUCTION PLANNING
MANUFACTURING PROCESSES
PRODUCTION MANAGEMENT
Notes
Appendix : p. 60 - 76
Bibliography : p. 59
Abstract
-
Physical Dimension
Number of Page(s)
xiii, 76 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02731/09
(T) 658.5 Har P
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
LKP : CV Laksana Semarang
E-supply chain
Analisa Produktivitas di PT. Japfa Comfeed Indonesia, Tbk.
LKP : perusahaan dan industri mesin Aneka Mesin Malang
LKP : analisa proses produksi guna memaksimumkan keuntungan dengan menggunakan pendekatan linier programming
World class manufacturing dekade mendatang
Perancangan fasilitas dan metode kerja yang ergonomis di PT. Friendship.
Perancangan sistem kanban pada line machining yoke di PT. Inti Ganda Perdana