Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Penurunan waktu dandori dan standarisasi kerja di Plant PI-GS area 7 dan 8 PT Astra Otoparts Divisi Adiwira Plastik
Author
Hariyanto, Tjin Hendri Kristian
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Jurusan Industri UK Petra, 2009
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.01041369/IND/2009
Subject(s)
PRODUCTION PLANNING
MANUFACTURING PROCESSES
PRODUCTION MANAGEMENT
Notes
Appendix : p. 60 - 76
Bibliography : p. 59
Abstract
-
Physical Dimension
Number of Page(s)
xiii, 76 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02731/09
(T) 658.5 Har P
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Analisa loss production pada departemen paku - seksi paku PT. Surabaya Wire
Penurunan waktu weekly cleaning glue pot dan drum serta penetapan jumlah operator pada proses pembungkusan karton
Standarisasi lintasan kerja penjahitan sepatu pada PT. XYZ
Analisis penyebab keterlambatan produksi departemen AD 2 PT. X
Perencanaan produksi cat tembok di PT. Warnatama Cemerlang
Pengukuran kinerja perusahaan dengan menggunakan kriteria malcolm baldrige national quality award dan usulan perbaikan di pt. bumi menara internusa
Kanban for the shopfloor
LKP : PT Tulus Tri Tunggal