Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Penurunan waktu dandori dan standarisasi kerja di Plant PI-GS area 7 dan 8 PT Astra Otoparts Divisi Adiwira Plastik
Author
Hariyanto, Tjin Hendri Kristian
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Jurusan Industri UK Petra, 2009
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.01041369/IND/2009
Subject(s)
PRODUCTION PLANNING
MANUFACTURING PROCESSES
PRODUCTION MANAGEMENT
Notes
Appendix : p. 60 - 76
Bibliography : p. 59
Abstract
-
Physical Dimension
Number of Page(s)
xiii, 76 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02731/09
(T) 658.5 Har P
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Peningkatan kapasitas produksi di PT. Intipelangi Drumasindo
Penjadualan dan inventory control produk-produk job order di PT. X Sidoarjo
LKP : PT Bhirawa Steel Surabaya
Analisa produktivitas proses produksi untuk meningkatkan kapasitas produksi di departemen NCR CV Dirgahayu
Perancangan MRQ, pengontrolan persediaan material, dan pengiriman barang jadi di departemen planning PT. Filma Utama Soap
LKP : CV United Mesindo
Perancangan sistem persediaan bahan baku regular di PT E-T-A Indonesia
Peningkatan produktivitas di PT Cipta Alam Indah