Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Penurunan waktu dandori dan standarisasi kerja di Plant PI-GS area 7 dan 8 PT Astra Otoparts Divisi Adiwira Plastik
Author
Hariyanto, Tjin Hendri Kristian
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Jurusan Industri UK Petra, 2009
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.01041369/IND/2009
Subject(s)
PRODUCTION PLANNING
MANUFACTURING PROCESSES
PRODUCTION MANAGEMENT
Notes
Appendix : p. 60 - 76
Bibliography : p. 59
Abstract
-
Physical Dimension
Number of Page(s)
xiii, 76 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02731/09
(T) 658.5 Har P
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
LKP : Bengkel Bersaudara Surabaya
LKP : di PT Ometraco Arya Samanta Surabaya
LKP : PT Waradia Utama Krian
Peramalan kebutuhan supporting material di PT. Agip Lubrindo Pratama
Perancangan tata letak fasilitas dan sistem inventory untuk meningkatkan kapasitas produksi pada departemen Carpenter PT Trias Sentosa, Tbk
Analisis penyebab keterlambatan produksi departemen AD 2 PT. X
Peranan otomatisasi dalam mengembangkan produk untuk meningkatkan produktivitas timbangan dacin pada Perusahaan "SSS" di Surakarta
Analisis pengurangan waiting time di lintasan original equipment manufacturing 1 PT Guntner Indonesia