Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Penurunan waktu dandori dan standarisasi kerja di Plant PI-GS area 7 dan 8 PT Astra Otoparts Divisi Adiwira Plastik
Author
Hariyanto, Tjin Hendri Kristian
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Jurusan Industri UK Petra, 2009
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.01041369/IND/2009
Subject(s)
PRODUCTION PLANNING
MANUFACTURING PROCESSES
PRODUCTION MANAGEMENT
Notes
Appendix : p. 60 - 76
Bibliography : p. 59
Abstract
-
Physical Dimension
Number of Page(s)
xiii, 76 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02731/09
(T) 658.5 Har P
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Upaya mengurangi keterlambatan proses produksi PT. Aweco Indosteel Perkasa
Peningkatan sistem manajemen persediaan packaging box di PT X
Perencanaan kebutuhan bahan baku pada PT "X" di Surabaya
Perancangan sistem pengendalian bahan baku sepatu di CV Sinar Terang
Perancangan quality plan di PT Sandang Anggun Moratex
LKP : PT. Bumi Wijaya Indah Kencana
Perencanaan kebutuhan bahan baku di PT. Universal Wisesa Industri
LKP : di PT Bhirawa Steel Surabaya