Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Penurunan production lead time MCset menggunakan pull system di PT. Schneider Indonesia
Author
Santoso, Handoko
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Jurusan Industri UK Petra, 2010
Language
Indonesian
ISBN
-
Series
Skripsi No. 01021423/IND/2010
Subject(s)
PLANT LAY OUT
FACTORY MANAGEMENT
PLANT ENGINEERING
Notes
Bibliography : p. 58
Abstract
-
Physical Dimension
Number of Page(s)
xi, 58 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02580/10
(T) 658.2 San P
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Rumah baca tematik di Surabaya
Perbaikan peramalan pemakaian bahan baku di PT. X dengan mempertimbangkan faktor special event
Facility manager's operation and maintenance handbook
Facilities design
Manufacturing organization and management
Mendesain ulang tata letak fasilitas PT. Friendship untuk peningkatan produksi
Orchid mechanical parts a pilot project for tooling monitoring system at PT Schneider Electric manufacturing Batam
Perbaikan sistem penanganan kontainer damage dengan memperhatikan biaya shifting kontainer dan kontainer overdue di PT "XYZ"