Please take a moment to complete this survey below

Library's collection Library's IT development Cancel

Penurunan production lead time MCset menggunakan pull system di PT. Schneider Indonesia

Author
  • Santoso, Handoko
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Jurusan Industri UK Petra, 2010
Language
Indonesian
ISBN
-
Series
Skripsi No. 01021423/IND/2010
Subject(s)
  • PLANT LAY OUT
  • FACTORY MANAGEMENT
  • PLANT ENGINEERING
Notes
Bibliography : p. 58
Abstract
-
Physical Dimension
Number of Page(s)
xi, 58 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
# Accession No. Call Number Location Status
1.02580/10(T) 658.2 San PLibrary - 8th FloorUnavailable : Removed

Similar Collection

by author or subject