Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Penurunan production lead time MCset menggunakan pull system di PT. Schneider Indonesia
Author
Santoso, Handoko
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Jurusan Industri UK Petra, 2010
Language
Indonesian
ISBN
-
Series
Skripsi No. 01021423/IND/2010
Subject(s)
PLANT LAY OUT
FACTORY MANAGEMENT
PLANT ENGINEERING
Notes
Bibliography : p. 58
Abstract
-
Physical Dimension
Number of Page(s)
xi, 58 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02580/10
(T) 658.2 San P
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Rumah baca tematik di Surabaya
Perancangan metode dan fasilitas kerja di janfu garment dengan pendekatan ergonomi untuk meningkatkan produktifitas pekerja
Practical guide to energy management for facilities engineers and managers
Mendesain ulang tata letak fasilitas PT. Friendship untuk peningkatan produksi
Orchid mechanical parts a pilot project for tooling monitoring system at PT Schneider Electric manufacturing Batam
Manufacturing facilities design and material handling
Facility manager's operation and maintenance handbook
Breaking the cost barrier