Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Penurunan production lead time MCset menggunakan pull system di PT. Schneider Indonesia
Author
Santoso, Handoko
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Jurusan Industri UK Petra, 2010
Language
Indonesian
ISBN
-
Series
Skripsi No. 01021423/IND/2010
Subject(s)
PLANT LAY OUT
FACTORY MANAGEMENT
PLANT ENGINEERING
Notes
Bibliography : p. 58
Abstract
-
Physical Dimension
Number of Page(s)
xi, 58 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02580/10
(T) 658.2 San P
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Rumah baca tematik di Surabaya
Practical guide to energy management for facilities engineers and managers
Perancangan ulang tata letak finished goods dan packing material di PT. Smart corporation
Peningkatan kapasitas produksi melalui penghitungan waktu baku, tata letak fasilitas, serta pemberian kompensasi di PT Surya Putra Barutama
Perancangan fasilitas kerja pemindahan asbes di pt. "x".
Manufacturing organization and management
Perancangan metode dan fasilitas kerja di janfu garment dengan pendekatan ergonomi untuk meningkatkan produktifitas pekerja
Breaking the cost barrier