Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Perancangan persiapan total productive maintenance pada proses produksi circuit breaker 1160 di PT E-T-A
Author
Manurung, Arifin Aucky R
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Jurusan Industri UK Petra, 2010
Language
Indonesian
ISBN
-
Series
Skripsi No. 02021435/IND/2010
Subject(s)
MANUFACTURING PROCESS
PLANT MAINTENANCE
Notes
Appendix : p. 40 - 41
Bibliography : p. 39
Abstract
-
Physical Dimension
Number of Page(s)
xiii, 41 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00545/11
(T) 658.202 Man P
-
Unavailable : Removed
Similar Collection
by author or subject
Materiology
Maintenance benchmarking and best practices
Chemical miling
Implementasi metode quick changeover untuk meminimalkan waktu setup di P.T.Z
Perbaikan sistem maintenance di PT. X
Perencanaan penjadualan perawatan mesin di PT Soponyono
Perancangan sistem perawatan mesin produksi dengan mempertimbangkan faktor biaya di PT Sri Intan Toki Industri
Penjadwalan perawatan mesin-mesin produksi di PT. Alam Kayu Sakti