Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Perancangan persiapan total productive maintenance pada proses produksi circuit breaker 1160 di PT E-T-A
Author
Manurung, Arifin Aucky R
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Jurusan Industri UK Petra, 2010
Language
Indonesian
ISBN
-
Series
Skripsi No. 02021435/IND/2010
Subject(s)
MANUFACTURING PROCESS
PLANT MAINTENANCE
Notes
Appendix : p. 40 - 41
Bibliography : p. 39
Abstract
-
Physical Dimension
Number of Page(s)
xiii, 41 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00545/11
(T) 658.202 Man P
-
Unavailable : Removed
Similar Collection
by author or subject
Perancangan sistem maintenance di PT. Mercu Gramaron
RSX production line analysis with line architecture design methodology in PT. Schneider Electric Manufacturing Batam
Perancangan jadwal preventive maintenance yang optimal di PT. Gunawan Dianjaya Steel
Analisa line architecture design methodology dan peningkatan produktivitas dengan eliminasi waste di area welding departemen mcb PT Schneider Indonesia
Analisis pengurangan waiting time di lintasan original equipment manufacturing 1 PT Guntner Indonesia
Upaya peningkatan sistem maintenance di departemen one way packaging PT. SS
Maintenance benchmarking and best practices
Sistem pengendalian persediaan suku cadang di PT. Romos Inti Cosmetic