Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Perancangan persiapan total productive maintenance pada proses produksi circuit breaker 1160 di PT E-T-A
Author
Manurung, Arifin Aucky R
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Jurusan Industri UK Petra, 2010
Language
Indonesian
ISBN
-
Series
Skripsi No. 02021435/IND/2010
Subject(s)
MANUFACTURING PROCESS
PLANT MAINTENANCE
Notes
Appendix : p. 40 - 41
Bibliography : p. 39
Abstract
-
Physical Dimension
Number of Page(s)
xiii, 41 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00545/11
(T) 658.202 Man P
-
Unavailable : Removed
Similar Collection
by author or subject
Measure busbar and power assy time for low voltage line at PT. Schneider Electric Indonesia
Penurunan total waktu dan line stop akibat abnormality pada proses dandori serta standarisasi kerja di area 1 dan 2 PT. Astra Otoparts Tbk. Divisi Adiwira Plastik
Industrial design
Perencanaan total productive maintenance di unit pembuatan mesin pengupas gabah tipe HC 6 BV PT. Agrindo
TPM implementation
Perancangan penjadwalan perawatan mesin dan pemesanan komponen di PT. Gema Ista Raya
Perancangan strategi perawatan yang tepat dengan reliability centered maintanance di PT. X
Perancangan sistem perawatan mesin produksi dengan mempertimbangkan faktor biaya di PT Sri Intan Toki Industri