Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Perancangan persiapan total productive maintenance pada proses produksi circuit breaker 1160 di PT E-T-A
Author
Manurung, Arifin Aucky R
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Jurusan Industri UK Petra, 2010
Language
Indonesian
ISBN
-
Series
Skripsi No. 02021435/IND/2010
Subject(s)
MANUFACTURING PROCESS
PLANT MAINTENANCE
Notes
Appendix : p. 40 - 41
Bibliography : p. 39
Abstract
-
Physical Dimension
Number of Page(s)
xiii, 41 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00545/11
(T) 658.202 Man P
-
Unavailable : Removed
Similar Collection
by author or subject
Lean enterprise systems
Penjadwalan perawatan mesin paku di PT. Prima Waru Industri
LKP : PT Gunawan Dianjaya Steel Surabaya
Pengurangan waktu pengecekan process control inspection QC patrol dengan metode lean manufacturing di PT. FSCM Manufacturing Indonesia
Facility management
RSX production line analysis with line architecture design methodology in PT. Schneider Electric Manufacturing Batam
Perencanaan penerapan reability centered maintenace (RCM) di PT. Kertarajasa Raya
Perancangan jadwal preventive maintenance pada segmen produksi plastik PT. ETA