Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Perancangan alokasi tenaga kerja optimal pada line packaging R20 di PT International Chemical Industry
Author
Candra, Hendry Sutanto
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Jurusan Industri UK Petra, 2011
Language
Indonesian
ISBN
-
Series
Skripsi No. 01021544/IND/2011
Subject(s)
TIME STUDY
WORK MEASUREMENT
Notes
Appendix: p. 51 - 69
Bibliography: p. 50
Abstract
-
Physical Dimension
Number of Page(s)
viii, 69 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
01347/12
(T) 658.54 Can P
-
Unavailable : Removed
Similar Collection
by author or subject
Analisa keseimbangan lintasan dan pengaruhnya terhadap tata letak pabrik pada pabrik kayu
Program komputer untuk penyiapan kebutuhan tenaga kerja dalam proyek konstruksi
Penerapan non-financial performance measurement berdasarkan konsep balanced scorecard sebagai informasi bagi manajemen dalam rangka pengukuran kinerja pada.....
Studi awal waktu pengecoran balok plat pada proyek bangunan bertingkat 6 lantai di Surabaya
Perancangan sistem pengukuran kinerja dengan metode integrated performance measurement systems di PT. Cahaya Angkasa Abadi
Penentuan reward di PT Fuboru Indonesia
Studi eksperimental: mengurangi bias pengukuran umum balanced scorecard dalam penilaian kinerja pada mahasiswa S1 program akuntansi bisnis
Analisa kecukupan jumlah transporter dan rancangan jadwal shift kerja operator di PT Philips Indonesia