Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Perancangan alokasi tenaga kerja optimal pada line packaging R20 di PT International Chemical Industry
Author
Candra, Hendry Sutanto
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Jurusan Industri UK Petra, 2011
Language
Indonesian
ISBN
-
Series
Skripsi No. 01021544/IND/2011
Subject(s)
TIME STUDY
WORK MEASUREMENT
Notes
Appendix: p. 51 - 69
Bibliography: p. 50
Abstract
-
Physical Dimension
Number of Page(s)
viii, 69 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
01347/12
(T) 658.54 Can P
-
Unavailable : Removed
Similar Collection
by author or subject
Perencanaan dan penjadualan produksi di PT.Duta Citra Audio Raya
Teknik penghitungan volume kerja
Penentuan waktu baku dan analisa perhitungan kebutuhan tenaga kerja stock preparation #1, #2, #3, dan #6 departemen stock preparation PT Suparma Tbk.
LKP : PT Ganda Wangsa Utama
LKP : penghitungan waktu baku dan efisiensi operator di PT Wonojati Wijoyo
Perencanaan kebutuhan bahan baku dan penjadwalan produksi
LKP : mesin pengerusan garam di PT Metalco
Produktivitas tenaga kerja sebelum dan sesudah perubahan volume pada kontrak untuk proyek pembangunan apartemen X dan hotel Y di Surabaya