Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Perancangan alokasi tenaga kerja optimal pada line packaging R20 di PT International Chemical Industry
Author
Candra, Hendry Sutanto
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Jurusan Industri UK Petra, 2011
Language
Indonesian
ISBN
-
Series
Skripsi No. 01021544/IND/2011
Subject(s)
TIME STUDY
WORK MEASUREMENT
Notes
Appendix: p. 51 - 69
Bibliography: p. 50
Abstract
-
Physical Dimension
Number of Page(s)
viii, 69 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
01347/12
(T) 658.54 Can P
-
Unavailable : Removed
Similar Collection
by author or subject
Analisa regresi untuk penetapan waktu standard pembuatan tangki (study kasus di PT Meco)
Implementasi KPI dan perancangan sistem e-KPI pada PT. XYZ
Perancangan metode dan fasilitas kerja di PT Niki Tunggal dengan menggunakan pendekatan ergonomi
Upaya penurunan lembur departemen part, apparel, dan accessoris (PAA) di CV. Roda Lintas Khatulistiwa
Perancangan dan pengukuran kinerja perusahaan kaca dengan metode performance prism
Peran internal organisasi dan suasana inovasi untuk peningkatan kinerja UKM
Pengukuran waktu kerja di departemen packaging PT Smart. Tbk.
LKP : mesin pemotongan dan pembentukan kayu di PT Margo Mulya Surya Perkasa