Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
LKP : PT Bayu Beringin Lestari Surabaya
Author
Mouzinho, Jorge Manuel
Additional Author(s)
-
Publisher
Surabaya: 1993
Language
Indonesian
ISBN
-
Series
Laporan Kerja Praktek : Elektrik I
Subject(s)
ELECTRIC POWER SYSTEMS
PLAZA SURABAYA-POWER SUPPLY
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
vii, 42 p.
Dimension
29
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
01090/94
L 621.3 Mou L/E-I
Library - 6th Floor
Unavailable : Removed
Similar Collection
by author or subject
Fungsi dan peranan PLTA sebagai pembangkit tenaga listrik beban puncak dan khususnya studi tentang PLTA Sengguruh
Studi suplai listrik dengan sistem pembangkit hibrida yang terdiri dari solar photovoltaic, wind turbine generator, diesel engine generator 200 KWH/hari tegangan 220 volt AC di Nusa Penida
LKP : PT Atlantic Biru Raya Ds. Sukerejo, Kabupaten Pasuruan
LKP : Bank Bumi Daya Tower Surabaya
Power system analysis
LKP : PT Surabaya Agung Industri Pulp dan Kertas Surabaya
Analisis perbaikan sistem penyaluran SUTT 150 Kv untuk menaikkan level tegangan suplai daya listrik ke konsumen besar Pabrik Semen Dwima Agung 80 MVA
Power system stability