Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
LKP : PLTU sektor Gresik, Gresik
Author
Kaware, Sonny
Additional Author(s)
-
Publisher
Surabaya: 1994
Language
Indonesian
ISBN
-
Series
Laporan Kerja Praktek : Elektrik II
Subject(s)
ELECTRIC GENERATORS
ELECTRIC TRANSFORMERS
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
93 p.
Dimension
29
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
03648/94
L 621.3 Kaw L/E-II
Library - 6th Floor
Unavailable : Removed
Similar Collection
by author or subject
Study tentang penggunaan negative sequence current filter untuk mengamankan generator 200 MW di PLTU Gresik Unit III
LKP : PT Kedawung Setia Waru Gunung
LKP : CV Pari Jaya Makmur Surabaya
Studi suplai listrik dengan sistem pembangkit hibrida yang terdiri dari solar photovoltaic, wind turbine generator, diesel engine generator 200 KWH/hari tegangan 220 volt AC di Nusa Penida
Konsep perencanaan sistem proteksi transformer daya untuk tegangan ekstra tinggi
Studi pengukuran arus bocor pada isolator sutm 20 KV akibat pencemaran garam di penyulang mengare gardu induk (GI) manyar, PLN UPJ area gresik
LKP : CV Sembilan
LKP : Pabrik Gula Kedawung PTP XXIV-XXV Pasuruan