Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
LKP : PT PLN (Persero) Transmisi Surabaya Selatan Gas Insulated Switchgear Waru
Author
Donohadi, Sujatmiko
Additional Author(s)
-
Publisher
Surabaya: 1994
Language
Indonesian
ISBN
-
Series
Laporan Kerja Praktek : Elektrik I
Subject(s)
ELECTRIC TRANSFORMERS
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
xi, 82 p.
Dimension
29
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00033/95
L 621.3 Don L/E-I
Library - 6th Floor
Unavailable : Removed
Similar Collection
by author or subject
LKP : PT Mulcindo Surabaya
Analisis kualitas dan keandalan sistem tenaga listrik 150 KV di Jawa Timur Bagian Timur dan Bali setelah dioperasikannya PLTU Paiton dengan metode analisis aliran daya fast decoupled
LKP : CV Surya Abadi Teknik
Konsep perencanaan sistem proteksi transformer daya untuk tegangan ekstra tinggi
LKP : PT PLN (Persero) pembangkitan dan penyaluran Jawa Bagian Timur dan Bali Sektor Surabaya Transmisi Surabaya Timur Gardu Induk Rungkut
Menurunkan tingkat arus harmonisa pada sistem tenaga listrik dengan kombinasi beban tak linear satu fasa dan tiga fasa
Perencanaan dan pembuatan current transformer untuk proteksi dengan rating 50/5 30 VA 380 V class 10P5 diaplikasikan pada reverse power relay, over current relay dan short circuit relay
Studi analisa pergeseran phasa pada transformator 3 , daya 3,3 KVA, tegangan 220/127 V, 50 Hz, dengan menggunakan pengaman differential relay MRD1-T, SEG