Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
LKP : PT Pindad (Persero) Bandung
Author
Go, Hwa Hui
Additional Author(s)
-
Publisher
Surabaya: 1994
Language
Indonesian
ISBN
-
Series
Laporan Kerja Praktek Mekanik
Subject(s)
MANUFACTURING PROCESSES
RAILROADS-EQUIPMENT AND SUPPLIES
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
ix, 55 p.
Dimension
29
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
01219/95
L 621.3 GoH L/m
Library - 6th Floor
Unavailable : Removed
Similar Collection
by author or subject
Analisis pembangunan PLTGU Samarinda 2x65 MW dalam kaitannya dengan konsumen industri di Samarinda
LKP : PT Ramasari Surya Persada Surabaya
Kelayakan diagram heyland untuk menentukan karakteristik kerja mesin asinkron di Lab. STL UK Petra
LKP : PT Boma Bisma Indra divisi diesel II Surabaya
LKP : di PT Ometraco Arya Samanta Surabaya
LKP : PT Ometraco Arya Samanta Surabaya
Rekayasa mutu pada proses pembuatan arang dengan menggunakan metode taguchi
LKP : PT Srikaya Putra Mas Sidoarjo