Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
LKP : PT Duta Graha Indah Contractor Surabaya
Author
Subiakto, Bambang
Additional Author(s)
-
Publisher
Surabaya: 1994
Language
Indonesian
ISBN
-
Series
Laporan kerja praktek elektris I
Subject(s)
ELECTRIC GENERATORS-ALTERNATING CURRENT
ELECTRIC POWER DISTRIBUTIONS
ELECTRIC POWER TRANSMISSION
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
viii, 47 p.
Dimension
29
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
01746/96
L 621.3 Sub L/E-I
Library - 6th Floor
Unavailable : Removed
Similar Collection
by author or subject
Konverter sumber tegangan 220 V satu fasa ke tiga fasa sebagai penggerak motor induksi tiga fasa 220/380 V, 1/3 HP, 2950 RPM
LKP : PT Atlantic Biru Raya Ds. Sukerejo, Kabupaten Pasuruan
Studi penerapan demand side management (dsm) dengan menggunakan lampu hemat energi pada pemakaian waktu beban puncak pln apj surabaya selatan
Study interkoneksi kelistrikan Jawa-Bali-Lombok dengan kabel laut tegangan tinggi 150 kV
LKP : PT Albatec Inti Surabaya
Power system harmonics
Studi kualitas dayalistrik di PT. Yanaprima Hastapersada, Sidoarjo
Studi keandalan pada SUTM 20 kV dengan menggunakan tinggi tiang 9 meter dab 11 meter di penyulang mengare GI Manyar PLN UPJ Area Gresik