Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
LKP : PT Duta Graha Indah Contractor Surabaya
Author
Subiakto, Bambang
Additional Author(s)
-
Publisher
Surabaya: 1994
Language
Indonesian
ISBN
-
Series
Laporan kerja praktek elektris I
Subject(s)
ELECTRIC GENERATORS-ALTERNATING CURRENT
ELECTRIC POWER DISTRIBUTIONS
ELECTRIC POWER TRANSMISSION
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
viii, 47 p.
Dimension
29
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
01746/96
L 621.3 Sub L/E-I
Library - 6th Floor
Unavailable : Removed
Similar Collection
by author or subject
Konverter sumber tegangan 220 V satu fasa ke tiga fasa sebagai penggerak motor induksi tiga fasa 220/380 V, 1/3 HP, 2950 RPM
LKP : PT Atlantic Biru Raya Ds. Sukerejo, Kabupaten Pasuruan
Power system analysis and design
Penentuan titik gangguan pada saluran transmisi menggunakan relay quadramho type SHPM 101 dengan implementasi pada SUTT 150 kV Situbondo-Banyuwangi
Studi pemeliharaan penyulang 20 kv dengan menggunakan data dari expert system (sistem pakar) di PLN UPJ area Gresik
Studi sistem distribusi dan instalasi listrik di Rumah Sakit Surabaya Internasional
Stdi sistem distribusi 3,3 kv, 25 mva di PT. Sasa Inti Gending Probolinggo
Electric energy systems theory