Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
LKP : PT Atlantic Biru Raya Ds. Sukerejo, Kabupaten Pasuruan
Author
Subiakto, Bambang
Additional Author(s)
-
Publisher
Surabaya: 1995
Language
Indonesian
ISBN
-
Series
Laporan kerja praktek elektris II
Subject(s)
ELECTRIC POWER SYSTEMS
MANUFACTURING PROCESSES
MINERAL WATER INDUSTRIES
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
ix, 55 p.
Dimension
30
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00307/96
L 621.3 Sub L/E-II
Library - 6th Floor
Unavailable : Removed
Similar Collection
by author or subject
Konverter sumber tegangan 220 V satu fasa ke tiga fasa sebagai penggerak motor induksi tiga fasa 220/380 V, 1/3 HP, 2950 RPM
LKP : PT Duta Graha Indah Contractor Surabaya
Peningkatan output produksi dengan metode SMED di area busbar PT Schneider Electric Indonesia
Studi kualitas daya listrik di Rumah Sakit Adi Husada Surabaya
Perancangan sistem departemen PPC cat di PT. Interkraft
LKP : Bank Bumi Daya Tower Surabaya
LKP : PT Yanasurya Bhaktipersada Sidoarjo
LKP : di PT Pimsf Pulogadung Jakarta