Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Improve metal shop process using lean six sigma at PT. Schneider Electric Indonesia
Author
Santoso, Harman
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Jurusan Industri UK Petra, 2007
Language
English
ISBN
-
Series
Tugas Akhir No.01041213/IND/2007
Subject(s)
SIX SIGMA (QUALITY CONTROL STANDARD)
MANUFACTURING PROCESSES
PRODUCTION MANAGEMENT
Notes
Appendix: p. 89 - 99
Bibliography: p. 88
Abstract
-
Physical Dimension
Number of Page(s)
xiv, 99 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02984/07
(T) - 658.562 San I
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
LKP : PT Modern Surya Jaya Rungkut Industri Surabaya
Penerapan weekly order change untuk mengurangi jangka waktu pemesanan komponen ekspor di PT Toyota Motor Manufacturing Indonesia
Production
Upaya mengurangi keterlambatan proses produksi PT. Aweco Indosteel Perkasa
LKP : PT Universal Wisesa Industry
Penerapan value stream mapping dalam upaya mengurangi waste guna menurunkan lead time proses penerimaan barang jadi di PT X
LKP : PT Agrindo Surabaya
LKP : di PT Jaya Pari Steel Corp. Ltd. Surabaya