Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
LKP : PT Sarana Surya Sakti
Author
Santosa, Agus Chandra
Additional Author(s)
Djunaedi, Deddy Kurniawan
Publisher
Surabaya: Madison Square Press, 1998
Language
Indonesian
ISBN
-
Series
Laporan kerja praktek II no. 98.2.017
Subject(s)
BICYCLE INDUSTRY
PRODUCTION ENGINEERING
PRODUCTION MANAGEMENT
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
ix, 76 p.
Dimension
30 cm
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
01927/99
L 621.8 San L-II
-
Unavailable : Removed
Similar Collection
by author or subject
Optimasi jumlah tenaga kerja dan kapasitas mesin di PT. Sarana Surya Sakti
Funkidz rice box
Peningkatan efisiensi dengan metode Line Architecture Design Methodology di PT Schneider Electric Indonesia
Perancangan flexible manpower production line di PT Astra Otoparts Tbk. divisi adiwira plastik
Evaluasi dan perbaikan bill of material di PT X.
Dynamics in logistics
Modern production management
Operations and supply management