Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Peningkatan kapasitas produksi dengan perbaikan metode kerja dan pengalokasian tenaga kerja di CV. Waru Indah
Author
Juwita, Regina Sari
Additional Author(s)
Billion, Franky Tjandra
Publisher
Surabaya: Fakultas Teknologi Industri , 2004
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.01010873/IND/2004
Subject(s)
FACILITY MANAGEMENT
PRODUCTION MANAGEMENT
Notes
Appendix: p. 88 - 145
Bibliography: p. 87
Abstract
-
Physical Dimension
Number of Page(s)
xv, 145 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00494/06
(T) - 658.5 Juw P
-
Unavailable : Removed
Similar Collection
by author or subject
Updating bill of material produk filter di PT X
Perbaikan tata letak pabrik koper dengan meminimalkan material handling pada lantai produksi
Upaya pencapaian target kapasitas produksi di line assembling western divisi gas PT Nayati Indonesia
Lean compendium
Penurunan waktu weekly cleaning glue pot dan drum serta penetapan jumlah operator pada proses pembungkusan karton
Peningkatan output produksi dan perancangan sistem di assy line tampio PT Astra Otoparts divisi adiwira plastik
Transparency master to accompany SPC essentials and productivity improvement: a manufacturing approach
Perbaikan quality assurance di PT FSCM Manufacturing Indonesia