Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Peningkatan kapasitas produksi dengan perbaikan metode kerja dan pengalokasian tenaga kerja di CV. Waru Indah
Author
Juwita, Regina Sari
Additional Author(s)
Billion, Franky Tjandra
Publisher
Surabaya: Fakultas Teknologi Industri , 2004
Language
Indonesian
ISBN
-
Series
Tugas Akhir No.01010873/IND/2004
Subject(s)
FACILITY MANAGEMENT
PRODUCTION MANAGEMENT
Notes
Appendix: p. 88 - 145
Bibliography: p. 87
Abstract
-
Physical Dimension
Number of Page(s)
xv, 145 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00494/06
(T) - 658.5 Juw P
-
Unavailable : Removed
Similar Collection
by author or subject
Perancangan metode dan fasilitas kerja dengan pendekatan ergonomi pada Departemen SKT di PT HM Sampoerna
Perancangan sistem informasi pada gudang bahan baku di PT. Serasa Purna Cipta
Pengoptimalan alokasi tenaga kerja pada bagian refinery dan fractionation di PT. Smart Tbk.
Analisa perbandingan kinerja laporan pengadaan material sebelum dan sesudah ERP SAP R/3 diimplementasikan di Domusindo Perdana
Perancangan value stream mapping dalam mengidentifikasi waste dan upaya pengurangan waste pada PT X
Analisa hubungan antara size, product life cycle, dan market position dengan penggunaan balanced scorecard pada sektor perbankan dan asuransi di Surabaya
Innovative control charting
Meminimalisasi frekuensi downtime pada mesin ayakan pellet 7 di PT Charoen Pokphand Indonesia Feedmill Balaraja