Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
LKP : peramalan permintaan produk spring bed PT Indofibre Mattress
Author
Yulianty, Fransiska
Additional Author(s)
-
Publisher
Surabaya: 1996
Language
Indonesian
ISBN
-
Series
Laporan kerja praktek II; manajemen industri
Subject(s)
INVENTORY CONTROL
MANUFACTURING ENGINEERING
PRODUCTION MANAGEMENT
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
xi, 75 p.
Dimension
29
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
03557/96
L 670.42 Yul L-II
Library - 6th Floor
Unavailable : Removed
Similar Collection
by author or subject
LKP : PT Evata Eastern jln. Suningrat no. 17 Kecamatan Taman Sidoarjo
Perancangan sistem pengendalian persediaan bahan baku spring bed di PT Indofibre Mattress
Competitive manufacturing management
Standarisasi lintasan kerja penjahitan sepatu pada PT. XYZ
Perancangan sistem perencanaan produksi di Agrindo Engineering Unit (AEU) PT Agrindo
LKP : PT Sentrabumi Palapa Utama Surabaya
Upaya menurunkan tingkat kecacatan proses casting di PT Makmur Sehati dengan metode eksperimen desain
Pengoptimalan sistem kanban internal lantai 3 di PT. Schneider Electric Manufacturing Batam