Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
LKP : PT Classic Prima Carpets Industries Surabaya
Author
Wiyono, Riawati
Additional Author(s)
-
Publisher
Surabaya: 1996
Language
Indonesian
ISBN
-
Series
Laporan kerja praktek I; produksi
Subject(s)
MANUFACTURING ENGINEERING
PRODUCTION PROCESSES
WORK MEASUREMENT
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
66 p.
Dimension
29 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
03512/96
L 670.42 Wiy L-I
Library - 6th Floor
Unavailable : Removed
Similar Collection
by author or subject
LKP : Ratu Dept. Store dan Supermarket
Perancangan tata letak area produksi di perusahaan toples dan botol plastik
Perencanaan kebutuhan material sabun di PT Megasurya Mas
LKP : PT Glogarindo Surabaya
LKP : PT Indrawood Megahtama Surabaya
Penentuan waktu baku dan analisa perhitungan kebutuhan tenaga kerja stock preparation #1, #2, #3, dan #6 departemen stock preparation PT Suparma Tbk.
Upaya pencapaian target pada unit single line departemen pengemasan di PT. Ulam Tiba Halim
Pengukuran kinerja dan usulan perbaikan di perusahaan rokok dwi tunggal.