Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
LKP : CV Ardecon Surya
Author
Lindawati, Dewi
Additional Author(s)
-
Publisher
Surabaya: 1996
Language
Indonesian
ISBN
-
Series
Laporan kerja praktek I; produksi
Subject(s)
MANUFACTURING PROCESSES
PRODUCTION ENGINEERING
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
vii, 85 p.
Dimension
29 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
03517/96
L 670.42 Lin L-I
Library - 6th Floor
Unavailable : Removed
Similar Collection
by author or subject
Pengukuran efisiensi teknis dan ekonomis dari proses produksi di PT Sinar Djaja Can
LKP : analisa produktivitas mesin insert didasarkan pada sistem penjadwalan di SBU II PT Panggung Electric Corporation Sidoarjo
Analisa penyebab cacat pada proses pembuatan body valve KTR 1/2
E-manufacture
LKP : PT Niko Teknik Surabaya
LKP : PT Boma Bisma Indra Divisi Diesel Surabaya
Peningkatan proses pada line assembly switch menggunakan metode video-analysis di PT Schneider Electric Ltd.
LKP : CV Laksana Semarang