Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
LKP : PT Ace Metal Indonesia
Author
Liminto, Suliani
Additional Author(s)
-
Publisher
Surabaya: 1996
Language
Indonesian
ISBN
-
Series
Laporan kerja praktek II: manajemen industri
Subject(s)
QUALITY CONTROL
MANUFACTURING ENGINEERING
PRODUCTION MANAGEMENT
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
viii, 48 p.
Dimension
29 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
03555/96
L 670.42 Lim L-II
Library - 6th Floor
Unavailable : Removed
Similar Collection
by author or subject
Perbaikan tata letak pabrik pada lintasan produksi bangku taman kayu PT Ace Metal Indonesia, Surabaya
LKP : penetapan waktu standard untuk lintasan produksi top meja (top line) type 630809 pada PT Djajanti Universal Gresik
Perbaikan tata letak pabrik pada lintasan produksi bangku taman kayu PT ACE Metal Indonesia, Surabaya
Leading manufacturing excellence
Identifikasi proses produksi komponen guide dengan metode DMAIC pada supplier PT. X
LKP : UD Karya Agung
Analysis the root causes in cup casting area and implementation acceptance sampling for attributes in qa clay pt. doulton
Production and operations management