Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
LKP : PT Ace Metal Indonesia
Author
Liminto, Suliani
Additional Author(s)
-
Publisher
Surabaya: 1996
Language
Indonesian
ISBN
-
Series
Laporan kerja praktek II: manajemen industri
Subject(s)
QUALITY CONTROL
MANUFACTURING ENGINEERING
PRODUCTION MANAGEMENT
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
viii, 48 p.
Dimension
29 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
03555/96
L 670.42 Lim L-II
Library - 6th Floor
Unavailable : Removed
Similar Collection
by author or subject
LKP : penetapan waktu standard untuk lintasan produksi top meja (top line) type 630809 pada PT Djajanti Universal Gresik
Perbaikan tata letak pabrik pada lintasan produksi bangku taman kayu PT Ace Metal Indonesia, Surabaya
Perbaikan tata letak pabrik pada lintasan produksi bangku taman kayu PT ACE Metal Indonesia, Surabaya
Pengukuran dan pengendalian biaya kualitas dalam rangka peningkatan efisiensi biaya produksi pada PT Kawan Setia di Gresik
Perancangan dan penerapan ISO 9001 : 2008 di PT. Teno Tract Indonesia
Operations management
Usulan perbaikan sistem pengendalian kualitas di PT. International Chemical Industry
Analisis proses transformasi dan konrol kualitas proses transformasi pada UD. Vialli