Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
LKP : PT Ace Metal Indonesia
Author
Liminto, Suliani
Additional Author(s)
-
Publisher
Surabaya: 1996
Language
Indonesian
ISBN
-
Series
Laporan kerja praktek II: manajemen industri
Subject(s)
QUALITY CONTROL
MANUFACTURING ENGINEERING
PRODUCTION MANAGEMENT
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
viii, 48 p.
Dimension
29 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
03555/96
L 670.42 Lim L-II
Library - 6th Floor
Unavailable : Removed
Similar Collection
by author or subject
LKP : penetapan waktu standard untuk lintasan produksi top meja (top line) type 630809 pada PT Djajanti Universal Gresik
Perbaikan tata letak pabrik pada lintasan produksi bangku taman kayu PT ACE Metal Indonesia, Surabaya
Perbaikan tata letak pabrik pada lintasan produksi bangku taman kayu PT Ace Metal Indonesia, Surabaya
Peranan pengendalian kualitas produk perusahaan plastik PT 'X' di Beji Pasuruan
ISO 9001:2008 quality manual
Pemodelan kendali sistem proses regenerasi bed active carbon di pt molindo inti gas menggunakan metode fuzzy inference system
Upaya peningkatan output aktual di line 2 finishing PT. Integra Indocabinet
LKP : PT Djajanti Universal Gresik