Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
LKP : PT Ace Metal Indonesia
Author
Liminto, Suliani
Additional Author(s)
-
Publisher
Surabaya: 1996
Language
Indonesian
ISBN
-
Series
Laporan kerja praktek II: manajemen industri
Subject(s)
QUALITY CONTROL
MANUFACTURING ENGINEERING
PRODUCTION MANAGEMENT
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
viii, 48 p.
Dimension
29 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
03555/96
L 670.42 Lim L-II
Library - 6th Floor
Unavailable : Removed
Similar Collection
by author or subject
LKP : penetapan waktu standard untuk lintasan produksi top meja (top line) type 630809 pada PT Djajanti Universal Gresik
Perbaikan tata letak pabrik pada lintasan produksi bangku taman kayu PT ACE Metal Indonesia, Surabaya
Perbaikan tata letak pabrik pada lintasan produksi bangku taman kayu PT Ace Metal Indonesia, Surabaya
Perancangan sistem manajemen mutu iso 9001:2000 di PT Jaya Garmen Sukses Makmur
Penjadwalan produksi dengan mempertimbangkan bottleneck di PT. Lestari Karya Makmur
Quality analysis of clay to biscuit using failure mode and effect analysis at PT Doulton
LKP : PT Ganda Wangsa Utama
Penurunan tingkat kecacatan pada line produksi low voltage di PT Schneider Indonesia