Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
LKP : penjadwalan proyek pembuatan tabung pemanas dan pencampur bijih plastik di bengkel konstruksi Sepanjang Baru
Author
Ichwan, Sunyata
Additional Author(s)
-
Publisher
Surabaya: 1996
Language
Indonesian
ISBN
-
Series
Laporan kerja praktek produksi
Subject(s)
MANUFACTURING PROCESSES
PRODUCTION ENGINEERING
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
iii, 67 p.
Dimension
30 cm
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02291/97
L 670.42 Ich L-I
Library - 6th Floor
Unavailable : Removed
Similar Collection
by author or subject
Penjadwalan perawatan peralatan di NGP Hotel, Surabaya
LKP: New Grand Park Hotel Surabaya
Peningkatan output produksi dengan metode SMED di area busbar PT Schneider Electric Indonesia
Manufacturing engineering and technology
LKP : PT Barata Indonesia Surabaya unit machining
LKP : PT Srikaya Putra Mas Sidoarjo
Teknologi mekanik
LKP : PT Lotus Indah Textile Industries Surabaya