Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
LKP: New Grand Park Hotel Surabaya
Author
Ichwan, Sunyata
Additional Author(s)
Soetanto, Arief
Publisher
Surabaya: 1997
Language
Indonesian
ISBN
-
Series
Laporan kerja praktek manajemen
Subject(s)
HOTEL MANAGEMENT
PRODUCTION MANAGEMENT
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
viii, 47 p.
Dimension
30 cm
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02277/97
L 670.42 Ich L-II
Library - 6th Floor
Available
Similar Collection
by author or subject
Penjadwalan perawatan peralatan di NGP Hotel, Surabaya
LKP : penjadwalan proyek pembuatan tabung pemanas dan pencampur bijih plastik di bengkel konstruksi Sepanjang Baru
Identifikasi proses produksi komponen guide dengan metode DMAIC pada supplier PT. X
Pengendalian proses pada sistem manajemen mutu ISO 9000 (studi kasus pada PT. Tatamulia Nusantara Indah)
Perbaikan tata letak pabrik koper dengan meminimalkan material handling pada lantai produksi
Hospitality sales and marketing
Operations management
Front office 3-in-1