Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
LKP: New Grand Park Hotel Surabaya
Author
Ichwan, Sunyata
Additional Author(s)
Soetanto, Arief
Publisher
Surabaya: 1997
Language
Indonesian
ISBN
-
Series
Laporan kerja praktek manajemen
Subject(s)
HOTEL MANAGEMENT
PRODUCTION MANAGEMENT
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
viii, 47 p.
Dimension
30 cm
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02277/97
L 670.42 Ich L-II
Library - 6th Floor
Available
Similar Collection
by author or subject
Penjadwalan perawatan peralatan di NGP Hotel, Surabaya
LKP : penjadwalan proyek pembuatan tabung pemanas dan pencampur bijih plastik di bengkel konstruksi Sepanjang Baru
VIP
Analisa sistem perencanaan produksi di CV. Sinar Baja Electric
Maksimasi produksi aggregate plant dengan pendekatan matematis (studi kasus aggregate plant PT. Perwita Karya)
LKP : PT Brother Silver Products Indonesia di Surabaya
Analisa pengaruh kualitas layanan bagian front office terhadap loyalitas pelanggan di hotel Shangri-la Surabaya
Petunjuk praktek pramusaji food and beverage service