Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
LKP: New Grand Park Hotel Surabaya
Author
Ichwan, Sunyata
Additional Author(s)
Soetanto, Arief
Publisher
Surabaya: 1997
Language
Indonesian
ISBN
-
Series
Laporan kerja praktek manajemen
Subject(s)
HOTEL MANAGEMENT
PRODUCTION MANAGEMENT
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
viii, 47 p.
Dimension
30 cm
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02277/97
L 670.42 Ich L-II
Library - 6th Floor
Available
Similar Collection
by author or subject
LKP : penjadwalan proyek pembuatan tabung pemanas dan pencampur bijih plastik di bengkel konstruksi Sepanjang Baru
Penjadwalan perawatan peralatan di NGP Hotel, Surabaya
Analisa penyebab lonjakan manhours ratio pada proses fabrikasi piping dan blasting painting di PT. Gunanusa Utama Fabricators
Operations management
Sistem produksi toyota
Studi deskriptif implementasi manajemen produksi pada PT. Antamas di Gresik
Production and operations management
Manajemen penyelenggaraan hotel