Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
LKP : instalasi tenaga listrik di PT Kualimas Aditama Sidoarjo
Author
Gunarto, Andreas
Additional Author(s)
-
Publisher
Surabaya: 1997
Language
Indonesian
ISBN
-
Series
Laporan kerja praktek elektris II
Subject(s)
ELECTRIC INSTALLATION
ELECTRIC POWER DISTRIBUTION
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
ix, 57 p.
Dimension
30 cm
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00059/98
L 621.3 Gun L/E-II
Library - 6th Floor
Unavailable : Removed
Similar Collection
by author or subject
LKP : PT Mulcindo Surabaya
Studi perbandingan karakteristik dari berbagai motor induksi satu phasa, khususnya motor split phase 3/4 PK, 2800 RPM, 220 V
LKP : pembangkit listrik diesel di PT Kuda Laut Mas Sidoarjo
Studi pengaman gangguan fasa tanah penyulang 20 kv bilka di GI Ngagel
Evaluasi pengaruh peralatan utama sistem distribusi tenaga listrik terhadap keandalan sistem dengan metode fmea (failure mode and effect analysis).studi kasus:sistem distribusi Jawa Timur penyulang...
Studi distribusi tenaga listrik di kota mandiri citra raya Surabaya
Studi kualitas daya listrik di gardu N 1 divisi niaga PT PAL Indonesia
Simulasi dan analisa efek penempatan capasitor 360, 310, 210 kVAR pada plant 1 di PT. Garudafood Putra Jaya