Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
LKP : instalasi tenaga listrik di PT Kualimas Aditama Sidoarjo
Author
Gunarto, Andreas
Additional Author(s)
-
Publisher
Surabaya: 1997
Language
Indonesian
ISBN
-
Series
Laporan kerja praktek elektris II
Subject(s)
ELECTRIC INSTALLATION
ELECTRIC POWER DISTRIBUTION
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
ix, 57 p.
Dimension
30 cm
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00059/98
L 621.3 Gun L/E-II
Library - 6th Floor
Unavailable : Removed
Similar Collection
by author or subject
LKP : PT Mulcindo Surabaya
Studi perbandingan karakteristik dari berbagai motor induksi satu phasa, khususnya motor split phase 3/4 PK, 2800 RPM, 220 V
LKP : pembangkit listrik diesel di PT Kuda Laut Mas Sidoarjo
Studi perencanaan penambahan (double) jumper SUTM 20 kV pada penyulang Pondok Chandra GI Rungkut PLN UJ Rungkut APJ Surabaya selatan
Studi kualitas daya listrik di PT. Indofood Sukses makmur
Studi tentang supply listrik di gedung Petra dan aspek ekonomisnya
LKP : Susunan gardu induk outdoor 150 kV sampai 70 kV dan PMT untuk gardu induk outdoor di gardu induk Waru
Studi analisa sistem distribusi dan instalasi listrik dengan menggunakan etap power station 4.0.0 pada hotel gajahmada graha