Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
LKP : distribusi dan instalasi tenaga listrik di PT Gudang Garam Surabaya
Author
Halim, Helen Chiauwati
Additional Author(s)
-
Publisher
Surabaya: 1997
Language
Indonesian
ISBN
-
Series
Laporan Kerja Praktek Elektrik I
Subject(s)
ELECTRIC INSTALLATION
ELECTRIC POWER DISTRIBUTION
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
viii, 264 p.
Dimension
30 cm
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00062/98
L 621.3 Hal L/E-I
Library - 6th Floor
Available
Similar Collection
by author or subject
LKP: Pembangkit tenaga listrik di New Grand Park Hotel Surabaya
Studi kualitas daya listrik di Rumah Sakit Adi Husada Surabaya
Studi sistem distribusi dan instalasi listrik di kapal republik indonesia (KRI) jenis pemburu ranjau (mine hunter killer)
Evaluasi pengaruh peralatan utama sistem distribusi tenaga listrik terhadap keandalan sistem dengan metode fmea (failure mode and effect analysis).studi kasus:sistem distribusi Jawa Timur penyulang...
LKP : distribusi dan instalasi tenaga listrik dengan daya 2 MVA di PT Siantar Top Waru-Sidoarjo
Perencanaan dan pembuatan induction voltage regulator dari motor asinkrun ( 3 fasa, 220/380 V, 2 HP )
Elements of power system analysis
Power distribution planning reference book