Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
LKP : distribusi dan instalasi tenaga listrik di PT Gudang Garam Surabaya
Author
Halim, Helen Chiauwati
Additional Author(s)
-
Publisher
Surabaya: 1997
Language
Indonesian
ISBN
-
Series
Laporan Kerja Praktek Elektrik I
Subject(s)
ELECTRIC INSTALLATION
ELECTRIC POWER DISTRIBUTION
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
viii, 264 p.
Dimension
30 cm
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00062/98
L 621.3 Hal L/E-I
Library - 6th Floor
Available
Similar Collection
by author or subject
Studi kualitas daya listrik di Rumah Sakit Adi Husada Surabaya
LKP: Pembangkit tenaga listrik di New Grand Park Hotel Surabaya
LKP : distribusi dan instalasi listrik di Gedung Mal Galaxi Surabaya
LKP : proyek Bank Pacific Surabaya
Evaluasi kehandalan sistem transmisi 150 kV di Jawa Timur studi kasus: sistem transmisi 150 kv sektor Malang
LKP : PT Alumindo Light Metal Industry Surabaya
LKP : PT Arisamandiri Pratama Semarang
Studi perbandingan pemakaian sutm 20 kv dengan ground wire dan tanpa ground wire PLN UPJ Area Gresik