Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
LKP : distribusi dan instalasi tenaga listrik di PT Gudang Garam Surabaya
Author
Halim, Helen Chiauwati
Additional Author(s)
-
Publisher
Surabaya: 1997
Language
Indonesian
ISBN
-
Series
Laporan Kerja Praktek Elektrik I
Subject(s)
ELECTRIC INSTALLATION
ELECTRIC POWER DISTRIBUTION
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
viii, 264 p.
Dimension
30 cm
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00062/98
L 621.3 Hal L/E-I
Library - 6th Floor
Available
Similar Collection
by author or subject
LKP: Pembangkit tenaga listrik di New Grand Park Hotel Surabaya
Studi kualitas daya listrik di Rumah Sakit Adi Husada Surabaya
IEEE recommended practice for electric power distribution for industrial plants
Perencanaan dan pembuatan induction voltage regulator dari motor asinkrun ( 3 fasa, 220/380 V, 2 HP )
Pemisahan kontribusi harmonisa konsumen dan utilitas pada point of common coupling (PCC) dengan metode gradien daya reaktif
Perkembangan distribusi tegangan menengah di surabaya selatan
Analisa instalasi listrik plant 1 biskuit di PT. Garudafood Putra Putri Jaya desa Krikilan 28 Driyorejo Gresik
Studi pengaman gangguan fasa tanah penyulang 20 kv bilka di GI Ngagel