Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
LKP : sistem pembangkitan di Mercure Grand Hotel Surabaya
Author
Sucahyo, Dennie
Additional Author(s)
-
Publisher
Surabaya: 1997
Language
Indonesian
ISBN
-
Series
Laporan kerja praktek elektris I
Subject(s)
DIESEL ELECTRIC POWER-PLANTS
ELECTRIC GENERATORS
ELECTRIC POWER-PLANTS
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
vii, 40 p.
Dimension
30 cm
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00146/98
L 621.3 Suc L/E-I
Library - 6th Floor
Available
Similar Collection
by author or subject
LKP: Pembuatan panel sinkron mannual 1000 KVA di Conductama Jerindo, P.T. Surabaya
Kontrol otomatis sistem listrik standby dan amergency pada satu genset 35 KVA, 380 V, 50 Hz, 3 phasa dengan menggunakan mikrocontroller 8031
Studi tentang pmg dalam sistem aksitasi generator set daya 600 KVA di PT. Conductama Jerbindo
Studi penerapan PLTD bahan bakar MFO 15MW untuk kelistrikan Desa Lapulu, Kecamatan Lapulu, Kabupaten Kendari, Sulawesi Tenggara
LKP : PLTU sektor Gresik, Gresik
Studi pemanfaatan energi panas bumi skala menengah sampai kecil menjadi energi listrik dengan kombinasi proses konvensional dan siklus biner untuk pembangkit listrik pedesaan di Indonesia sampai denga
Dasar tenaga listrik
Studi pengoperasian generator set 1000 KVA, 1500 RPM di wisma BII Surabaya