Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
LKP : sistem pembangkitan di Mercure Grand Hotel Surabaya
Author
Sucahyo, Dennie
Additional Author(s)
-
Publisher
Surabaya: 1997
Language
Indonesian
ISBN
-
Series
Laporan kerja praktek elektris I
Subject(s)
DIESEL ELECTRIC POWER-PLANTS
ELECTRIC GENERATORS
ELECTRIC POWER-PLANTS
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
vii, 40 p.
Dimension
30 cm
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00146/98
L 621.3 Suc L/E-I
Library - 6th Floor
Available
Similar Collection
by author or subject
LKP: Pembuatan panel sinkron mannual 1000 KVA di Conductama Jerindo, P.T. Surabaya
Kontrol otomatis sistem listrik standby dan amergency pada satu genset 35 KVA, 380 V, 50 Hz, 3 phasa dengan menggunakan mikrocontroller 8031
Studi pemanfaatan renewable energy sebagai supply listrik khususnya biogas sebagai sumber listrik alternatif di Kabupaten Magetan, Jawa Timur
LKP : Pabrik Gula Kedawung PTP XXIV-XXV Pasuruan
Studi teknis pengoperasian diesel genset (PLTD) 3000 KVA di PT. Kayan River Indah Plywood, Sumber Mas Group Samarinda
LKP : pembangkit listrik gedung fakultas teknik Universitas Kristen Petra Surabaya
Studi operasi dan kontrol dari tiga pembangkit di PT. Sasa Inti, Gending, Probolinggo
Dasar tenaga listrik