Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
LKP : sistem pembangkitan di Mercure Grand Hotel Surabaya
Author
Sucahyo, Dennie
Additional Author(s)
-
Publisher
Surabaya: 1997
Language
Indonesian
ISBN
-
Series
Laporan kerja praktek elektris I
Subject(s)
DIESEL ELECTRIC POWER-PLANTS
ELECTRIC GENERATORS
ELECTRIC POWER-PLANTS
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
vii, 40 p.
Dimension
30 cm
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00146/98
L 621.3 Suc L/E-I
Library - 6th Floor
Available
Similar Collection
by author or subject
Kontrol otomatis sistem listrik standby dan amergency pada satu genset 35 KVA, 380 V, 50 Hz, 3 phasa dengan menggunakan mikrocontroller 8031
LKP: Pembuatan panel sinkron mannual 1000 KVA di Conductama Jerindo, P.T. Surabaya
Perencanaan sizing dan analisa biaya energi sistem PLTS di komunitas Desa Muara Langon, Kabupaten Paser, Kalimantan Timur
Kontrol otomatis sistem listrik standby dan amergency pada satu genset 35 KVA, 380 V, 50 Hz, 3 phasa dengan menggunakan mikrocontroller 8031
Analisa tekno-ekonomis dari simulasi pemanfaatan pembangkit hybrid micro off grid wind turbine-photovoltaic
Power plant performance
LKP : PT Perkebunan XX (Persero) PG Kanigoro Madiun
Desain sistem tenaga modern