Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
LKP : pengukuran waktu kerja dan peta peta kerja di CV Phoenix Mas Lombok Barat
Author
Pangestuti, Gesang Puji
Additional Author(s)
Sari, Lale Ira Amrita
Publisher
Surabaya: 1998
Language
Indonesian
ISBN
-
Series
Laporan kerja praktek manajemen
Subject(s)
MOTION STUDY
WORK MEASUREMENT
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
vii, 74 p.
Dimension
29 cm
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
06412/98
L 670.42 Pan L-II
Library - 6th Floor
Available
Similar Collection
by author or subject
Analisa pengukuran efisiensi logistik di PT. PLN (persero) proyek induk pembangkit dan jaringan jawa timur dan nusa tenggara dengan metode analisis efisiensi teknis dan ekonomis
Upaya pengalokasian operator in-line QC di PT Smart Tbk.
Peningkatan performa metode kerja adm pro msp pricing pada PT Toyota Motor Manufacturing Indonesia
Peningkatan produktivitas dengan penetapan waktu kerja standar proses pembuatan sepeda
Perancangan alokasi tenaga kerja optimal pada line packaging R20 di PT International Chemical Industry
Perencanaan kebutuhan bahan baku di PT. Trijaya
Simulasi pertimbangan pertambahan mesin dengan promodel di UD. XYZ
Analisis lead time kontainer dengan simulasi value stream mapping di PT X