Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
LKP : PT Brother Silver Products Indonesia di Surabaya
Author
Tanaya, Candra
Additional Author(s)
Handoyo, Heri
Publisher
Surabaya: Madison Square Press, 1997
Language
Indonesian
ISBN
-
Series
Laporan kerja praktek II
Subject(s)
PRODUCTION ENGINEERING
PRODUCTION MANAGEMENT
SILVER WORK-INDUSTRY
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
vi, 61 p.
Dimension
30 cm
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
01914/99
L 621.8 Tan L-II
Library - 6th Floor
Available
Similar Collection
by author or subject
Merendahkan titik berat kendaraan kijang dengan chassis semimonocoque
Perancangan quality plan di CV X Sidoarjo
Analisa pengendalian persediaan bahan baku pada PT Arta Sakti Sidoarjo
Usulan upaya pengurangan downtime mesin potong single deck di PT. 'X'
LKP : PT Sinar Angkasa Rungkut Surabaya
Production
Peningkatan produktivitas di PT Cipta Alam Indah
Creating quality