Please take a moment to complete this survey below

Library's collection Library's IT development Cancel

Perbandingan metode lot for lot policy after stage 1 dan forecast beyond the planning horizon untuk perencanaan kebutuhan material di PT Golden Rubberindo

Author
  • Margaretha
Additional Author(s)
-
Publisher
Surabaya: 1999
Language
Indonesian
ISBN
-
Series
Tugas akhir No. 230/TI-56/1999
Subject(s)
  • PRODUCTION PLANNING
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
viii, 105 p.
Dimension
30 cm
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
# Accession No. Call Number Location Status
1.04126/99(T) 658.5038 Mar PLibrary - 8th FloorUnavailable : Removed
2.04127/99(T) 658.5038 Mar P-Unavailable : Removed

Similar Collection

by author or subject