Please take a moment to complete this survey below

Library's collection Library's IT development Cancel

Integrasi perencanaan produksi agregat dan perencanaan kebutuhan mesin di PT. Nusantara Plywood

Author
  • Krisnawati, Selia
Additional Author(s)
-
Publisher
Surabaya: 2001
Language
Indonesian
ISBN
-
Series
Tugas akhir No. 496/TI-087/2001
Subject(s)
  • INDUSTRIAL ENGINEERING
  • PRODUCTION ENGINEERING
  • PRODUCTION PLANNING
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
xiii, 130 p.
Dimension
30 cm
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
# Accession No. Call Number Location Status
1.03133/01(T) 658.5 Kri ILibrary - 8th FloorUnavailable : Removed
2.03134/01(T) 658.5 Kri ILibrary - 8th FloorUnavailable : Removed

Similar Collection

by author or subject