Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Perancangan incoming material system departeman paku-seksi paku PT. Surabaya Wire
Author
Herianto, Rudi
Additional Author(s)
-
Publisher
Surabaya: 2004
Language
Indonesian
ISBN
-
Series
Tugas Akhir No. 02/0790/IND/2004
Subject(s)
MANUFACTURING PROCESSES
PRODUCTION CONTROL
PRODUCTION PLANNING
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
xiii, 31 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
01032/04
(T) 658.5 Her P
-
Unavailable : Removed
Similar Collection
by author or subject
LKP : PT Boma-Bisma-Indra (Persero) divisi mesin peralatan pabrik Pasuruan
Perancangan business process dan sistem standard operating procedure di PT. Zensei Indonesia
Perencanaan kebutuhan bahan baku di PT. Universal Wisesa Industri
Penjadualan dan inventory control produk-produk job order di PT. X Sidoarjo
LKP : di PT Jaya Pari Steel Corp. Ltd. Surabaya
Effeciency improvement plan with kaizen methodology in pre-wiring and preparation station of SM6 line at PT Schneider Indonesia
LKP : PT Boma Bisma Indra divisi diesel II Surabaya
Pengoptimalan kapasitas produksi pail can di PT. Intipelangi Drumasindo