Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Perancangan incoming material system departeman paku-seksi paku PT. Surabaya Wire
Author
Herianto, Rudi
Additional Author(s)
-
Publisher
Surabaya: 2004
Language
Indonesian
ISBN
-
Series
Tugas Akhir No. 02/0790/IND/2004
Subject(s)
MANUFACTURING PROCESSES
PRODUCTION CONTROL
PRODUCTION PLANNING
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
xiii, 31 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
01032/04
(T) 658.5 Her P
-
Unavailable : Removed
Similar Collection
by author or subject
Upaya penurunan tingkat kecacatan di PT Halim Jaya Sakti
Fundamental manufacturing processes
Perencanaan kebutuhan bahan baku di PT Jaya Makmur
LKP : CV United Mesindo
LKP : CV Lambang Jaya Malang
LKP : pabrik mesin & industri Lambang Jaya Malang
LKP : CV Dwitama Informatika
Evaluasi dan perbaikan bill of material di PT X.