Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Perancangan incoming material system departeman paku-seksi paku PT. Surabaya Wire
Author
Herianto, Rudi
Additional Author(s)
-
Publisher
Surabaya: 2004
Language
Indonesian
ISBN
-
Series
Tugas Akhir No. 02/0790/IND/2004
Subject(s)
MANUFACTURING PROCESSES
PRODUCTION CONTROL
PRODUCTION PLANNING
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
xiii, 31 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
01032/04
(T) 658.5 Her P
-
Unavailable : Removed
Similar Collection
by author or subject
Peranan linear programming untuk memaksimumkan laba dalam produk mix pada PT. "X" di Gresik
Perancangan sistem perencanaan produksi dan pengendalian bahan baku di PT Gunungarta Manunggal
LKP : PT Ometraco Arya Samanta Surabaya
LKP : PD Aneka Jasa dan Permesinan Unit V Surabaya
LKP : Bengkel Sanjaya Surabaya
LKP : di CV Lambang Jaya ; proses pembuatan mesin pengering kapulaga
Upaya perbaikan dengan meminimalisasi downtime PT. Surabaya Mekabox
Penerapan petri nets pada perancangan jangka pendek dan inisialisasi penjadwalan produksi di PT. Iga Abadi