Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Peningkatan kapasitas produksi dengan pendekatan simulasi di pt. x
Author
Santoso, Budi
Additional Author(s)
-
Publisher
Surabaya: 2003
Language
Indonesian
ISBN
-
Series
Tugas Akhir No. 01/0748/IND/2003
Subject(s)
INDUSTRIAL CAPACITY-SIMULATION METHODS
PRODUCTION PLANNING
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
xii, 158 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00757/04
(T) 658.50011 San P
-
Unavailable : Removed
Similar Collection
by author or subject
Perbandingan antara analisa statik nonlinier pushover dengan analisa dinamik nonlinier riwayat waktu secara tiga dimensi beraturan
LKP : bagian proyek pembangunan Jalan Gempol-Pasuruan (paket AK-3) Bangil
Penggunaan serat ijuk sebagai campuran split mastic asphalt (SMA)
Faktor-faktor pemilihan pedel dan sirtu sebagai bahan perbaikan tanah
Penerapan petri nets pada perancangan jangka pendek dan inisialisasi penjadwalan produksi di PT. Iga Abadi
Penjadwalan produksi, pengaturan penyediaan bahan baku, dan pengaturan pengiriman produk jadi creamer, maizena, dan seasoning di PT. Hakiki Donarta Surabaya
Laporan tugas: perencanaan dan perancangan produk future map
Perancangan sistem perencanaan produksi dan pengendalian bahan baku di PT Gunungarta Manunggal