Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Peningkatan kapasitas produksi dengan pendekatan simulasi di pt. x
Author
Santoso, Budi
Additional Author(s)
-
Publisher
Surabaya: 2003
Language
Indonesian
ISBN
-
Series
Tugas Akhir No. 01/0748/IND/2003
Subject(s)
INDUSTRIAL CAPACITY-SIMULATION METHODS
PRODUCTION PLANNING
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
xii, 158 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00757/04
(T) 658.50011 San P
-
Unavailable : Removed
Similar Collection
by author or subject
LKP : penerapan penyebaran fungsi mutu untuk menterjemahkan keinginan konsumen pada Perusahaan "X"
LKP: Proyek rumah toko Bukit Darmo Raya Jl. Putat Gede
LKP : bagian proyek pembangunan Jalan Gempol-Pasuruan (paket AK-3) Bangil
Perbandingan antara analisa statik nonlinier pushover dengan analisa dinamik nonlinier riwayat waktu secara tiga dimensi beraturan
Perencanaan produksi perusahaan sepeda
Perancangan sistem PPIC (production planning, inventory and control) produk flusher di PT. Surya Indomental Semesta
Perencanaan dan pengendalian produksi di PT. Sabda Panca Elektronik
Penentuan waktu baku dan analisa perhitungan kebutuhan tenaga kerja seksi paper machine 1, 2 dan 3 PT. Suparma Tbk Surabaya