Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Optimalisasi pembelian harian pagi untuk meningkatkan ekspektasi keuntungan Suyitno Agency melalui perencanaan kuantitas pemesanan
Author
Halim, Kennardi Adisurya
Additional Author(s)
-
Publisher
Surabaya: 2003
Language
Indonesian
ISBN
-
Series
Tugas Akhir No. 01/0736/IND/2003
Subject(s)
INVENTORY CONTROL
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
xii, 87 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
01654/04
(T) 658.787 Hal O
-
Unavailable : Removed
Similar Collection
by author or subject
Perencanaan persediaan dan sistem database inventori bahan baku di PT. Akzo Nobel Raung Resins
Analisa kinerja manufacturing resource planning (MRP II) untuk produk filamen dan anchor di PT. Cahaya Angkasa Abadi
Perancangan MRQ, pengontrolan persediaan material, dan pengiriman barang jadi di departemen planning PT. Filma Utama Soap
Implementasi modul sales and distribution (sd) enterprise resource planning (erp) dengan mfg pro ver eb2 (qad) di unit cabang jakarta dan kediri pt. akari indonesia
Pengendalian persediaan bahan baku dengan metode MRP pada PT. Halim Jaya Sakti
Perencanaan dan pengendalian bahan baku plastik di CV. Asterindo
Perancangan pengendalian persediaan dan tata letak gudang di PT. Aneka Prima
Perencanaan produksi dan persediaan di PT. Tirta Bahagia