Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Studi kelayakan perluasan perusahaan sepatu dan topi CV. XYZ
Author
Kristiawan, Rony
Additional Author(s)
-
Publisher
Surabaya: 2003
Language
Indonesian
ISBN
-
Series
Tugas Akhir No. 02/0728/IND/2003
Subject(s)
PRODUCTION MANAGEMENT
PRODUCTION PLANNING-FEASIBILITY STUDY
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
xiv, 68 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
01703/04
(T) 658.5 Kri S
-
Unavailable : Removed
Similar Collection
by author or subject
Factory physics
Peningkatan produktivitas melalui perbaikan metode kerja dan perancangan fasilitas kerja di industri pemintalan benang untuk tekstil pada PT Hapete
Peranan material handling dalam efisiensi biaya produksi pada PT Dakar foam Utama
Operations management
Upaya perbaikan produk bumbu masak PT. Elson Bernardi
Just in time factory
Peningkatan produktivitas produk D16D di assembly line A PT Astra Otoparts divisi Adiwira Plastik
E-supply chain