Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Studi kelayakan perluasan perusahaan sepatu dan topi CV. XYZ
Author
Kristiawan, Rony
Additional Author(s)
-
Publisher
Surabaya: 2003
Language
Indonesian
ISBN
-
Series
Tugas Akhir No. 02/0728/IND/2003
Subject(s)
PRODUCTION MANAGEMENT
PRODUCTION PLANNING-FEASIBILITY STUDY
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
xiv, 68 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
01703/04
(T) 658.5 Kri S
-
Unavailable : Removed
Similar Collection
by author or subject
Pengurangan lead time produksi mcset di PT. Schneider Indonesia
Analisis pengembangan produk pada PT. Indofood Sukses Makmur divisi Bogasari Flour Mills di Surabaya
Penurunan waktu dandori dan standarisasi kerja di Plant PI-GS area 7 dan 8 PT Astra Otoparts Divisi Adiwira Plastik
Perancangan 5s di area produksi PT X
LKP : PT XYZ
Assembly automation
Operations management
Hubungan trust, konmitmen, information sharing, dan information quality terhadap kinerja supply chain management retailer bahan bangunan di Surabaya