Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Studi teknis pengoperasian diesel genset (PLTD) 3000 KVA di PT. Kayan River Indah Plywood, Sumber Mas Group Samarinda
Author
Lawono, Edwin
Additional Author(s)
-
Publisher
Surabaya: 2004
Language
Indonesian
ISBN
-
Series
Tugas Akhir No. 01010495/ELK/2004
Subject(s)
DIESEL ELECTRIC POWER-PLANTS
ELECTRIC POWER-PLANTS
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
xii, 115 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02502/04
(T) 621.3121 Law S
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
LKP : pembangkit listrik gedung fakultas teknik Universitas Kristen Petra Surabaya
Studi suplai listrik dengan sistem pembangkit hibrida yang terdiri dari solar photovoltaic, wind turbine generator, diesel engine generator 200 KWH/hari tegangan 220 volt AC di Nusa Penida
Analisa tekno-ekonomis dari simulasi pemanfaatan pembangkit hybrid micro off grid wind turbine-photovoltaic
LKP : PT ITP Bogasari Flour Mills division Surabaya
LKP : pembangkit listrik tenaga diesel Shangri-La Hotel Surabaya
LKP : PT PLN (Persero) pembangkitan dan penyaluran Jawa bagian timur dan Bali sektor Brantas-PLTA Sengguruh
LKP : PLTU sektor Gresik, Gresik
Study tentang penggunaan negative sequence current filter untuk mengamankan generator 200 MW di PLTU Gresik Unit III