Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
LKP : PT ITP Bogasari Flour Mills division Surabaya
Author
James
Additional Author(s)
-
Publisher
Surabaya: 1994
Language
Indonesian
ISBN
-
Series
Laporan kerja elektris II
Subject(s)
DIESEL ELECTRIC POWER-PLANTS
ELECTRIC GENERATORS
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
ix, 79 p.
Dimension
29
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
01594/96
L 621.3 Jam L/E-II
Library - 6th Floor
Unavailable : Removed
Similar Collection
by author or subject
LKP : PT Ometraco Arya Samanta Surabaya
LKP : PLTU sektor Gresik, Gresik
Studi kerja paralel generator secara otomatis serta mekanisme CB saat kerja paralel di PLTU sektor Gresik
Modern power station practice
LKP : sistem pembangkitan di Mercure Grand Hotel Surabaya
Perencanaan dan pembuatan active load balancing unit pada generator 3 fase, 220/380 V, 25 KVA, beban dibatasi 5 KW, unit diparalel dengan PLN
Peningkatan unjuk kerja mekanisme alat pembangkit listrik tenaga bobot kendaraan di perlintasan portal area parkir
LKP : CV Sumber Baru Semarang