Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Studi perencanaan penambahan (double) jumper SUTM 20 kV pada penyulang Pondok Chandra GI Rungkut PLN UJ Rungkut APJ Surabaya selatan
Author
Mestiko, Yudo
Additional Author(s)
-
Publisher
Surabaya: 2004
Language
Indonesian
ISBN
-
Series
Tugas Akhir No. 01010484/ELK/2004
Subject(s)
ELECTRIC POWER DISTRIBUTION
ELECTRIC POWER TRANSMITION
ELECTRIC TRANSFORMERS
Notes
-
Abstract
-
Physical Dimension
Number of Page(s)
xvi, 175 P.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02513/04
(T) 621.319 Mes S
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
LKP : PT PLN (Persero) pembangkitan dan penyaluran Jawa Bagian Timur dan Bali Sektor Surabaya transmisi Surabaya Timur Gardu Induk Sukolilo
LKP : distribusi dan instalasi listrik di PT Surya Sakti Utama Surabaya
Studi pengukuran arus bocor pada isolator sutm 20 KV akibat pencemaran garam di penyulang mengare gardu induk (GI) manyar, PLN UPJ area gresik
Aplikasi gas-insulated substation 150 KV dengan memakai bahan isolasi gas SF6 yang diaplikasikan pada jaringan tegangan 150 KV di Jawa Timur ...
LKP : PLTU sektor Gresik, Gresik
Studi tentang power supply bagi gedung bertingkat 30 di Pavilion Park Apartment, Jakarta
Studi sistem distribusi dan instalasi listrik di kapal republik indonesia (KRI) jenis pemburu ranjau (mine hunter killer)
Menurunkan tingkat arus harmonisa pada beban tak linier 3x1 fasa dengan kombinasi beban tak linier 1x3 fasa dan zig-zag winding