Please take a moment to complete this survey below

Library's collection Library's IT development Cancel

Orchid mechanical parts a pilot project for tooling monitoring system at PT Schneider Electric manufacturing Batam

Department Industrialization Parts PT Schneider Electric Manufacturing Batam, in this time in pursuance of tooling renewal and repair inwhich result from this tooling renewal and repair will very affecting to thecontinuity of company production. Therefore this Final Assignmentcontain about making ofrepair and renewal tool scheduleespecially inOrchid product group by using Microsoft Excel software. The purposeof making this programisto facilitate making ofschedule so that repair and renewal toolscan be watched eminently and finally production process can walk at ease. This program isalso expected can analyze is the cost of depreciationif Industrialization Parts engineer is getting late to make repair or renewal tools.Use of this program issimple enough, that is input material master, name of component along with its part number, PO quantity, tool life in shot, amount of workday during one months, budget, and forecast quantity. Automatically, program will makescheduling and countenumeration of depreciation.

Creator(s)
  • (25404012) RATNA ANGGRAENI
Contributor(s)
  • Tanti Octavia → Advisor 1
  • PREDEEP N.NAIR → Advisor 2
  • Togar Wiliater Soaloon Panjaitan, S.T., MBA. → Examination Committee 1
Publisher
Universitas Kristen Petra; 2008
Language
English
Category
s1 – Undergraduate Thesis
Sub Category
Skripsi/Undergraduate Thesis
Source
Undergraduate Thesis No.01041301/IND/2008; Ratna Anggraeni (25404012)
Subject(s)
  • PLANT MAINTENANCE
  • PLANT ENGINEERING
File(s)

Similar Collection

by creator, contributor, or subject