Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Lembaga bimbingan belajar sekolah dasar smart education
-
Creator(s)
(31496300) DAVID JUWONO
(31496262) RONNE YUS
Contributor(s)
MICHAEL RICKY → Advisor 1
Eddy Madiono Sutanto → Examination Committee 1
Publisher
Universitas Kristen Petra; 2000
Language
Indonesian
Category
s1 – Undergraduate Thesis
Sub Category
Rancangan Usaha
Source
Rancangan Usaha No. 35/EM/2000; David Juwono (31496300), Ronne Yus (31496262)
Subject(s)
SCHOOL MANAGEMENT AND ORGANIZATION
MANAGEMENT
INDUSTRIAL MANAGEMENT
File(s)
jiunkpe-ns-s1-2000-31496300-15343-sekolah_dasar-cover.pdf
jiunkpe-ns-s1-2000-31496300-15343-sekolah_dasar-abstract_toc.pdf
jiunkpe-ns-s1-2000-31496300-15343-sekolah_dasar-chapter1.pdf
jiunkpe-ns-s1-2000-31496300-15343-sekolah_dasar-chapter2.pdf
jiunkpe-ns-s1-2000-31496300-15343-sekolah_dasar-chapter3.pdf
jiunkpe-ns-s1-2000-31496300-15343-sekolah_dasar-chapter4.pdf
jiunkpe-ns-s1-2000-31496300-15343-sekolah_dasar-chapter5.pdf
jiunkpe-ns-s1-2000-31496300-15343-sekolah_dasar-chapter6.pdf
jiunkpe-ns-s1-2000-31496300-15343-sekolah_dasar-chapter7.pdf
jiunkpe-ns-s1-2000-31496300-15343-sekolah_dasar-chapter8.pdf
jiunkpe-ns-s1-2000-31496300-15343-sekolah_dasar-chapter9.pdf
jiunkpe-ns-s1-2000-31496300-15343-sekolah_dasar-chapter10.pdf
jiunkpe-ns-s1-2000-31496300-15343-sekolah_dasar-references.pdf
jiunkpe-ns-s1-2000-31496300-15343-sekolah_dasar-appendices.pdf
Similar Collection
by creator, contributor, or subject
Perencanaan suksesi pada perusahaan keluarga PT Gading Murni
Pengaruh variabel individual, keorganisasian dan psikologikal terhadap perilaku kerja karyawan PT. Kalindo Jaya di Kediri
Fruit tender touch
Analisis job description karyawan bagian operasional CV Dian Jaya Surabaya
X-tra large Boutique
Analisis risiko K3 dengan metode hazard identification, risk assessment, and risk control pada area produksi PT X
Milenium koi
Analisis penyebab keterlambatan produksi departemen AD 2 PT X