Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Pengendalian proses sizing udang di PT Sumber Bahari Prima
-
Creator(s)
(14586041) BAMBANG SOEWANTO
Contributor(s)
KRESNAYANA YAHYA → Advisor and Examination Committee
Jani Rahardjo → Advisor 2
Publisher
Universitas Kristen Petra; 1992
Language
Indonesian
Category
s1 – Undergraduate Thesis
Sub Category
Skripsi/Undergraduate Thesis
Source
Skripsi No. 92.54.087; Bambang Soewanto (14586041)
Subject(s)
PRODUCTION CONTROL
PRODUCTION MANAGEMENT
PRODUCTION STANDARDS
File(s)
jiunkpe-ns-s1-1992-14586041-24126-udang-cover.pdf
jiunkpe-ns-s1-1992-14586041-24126-udang-abstract_toc.pdf
jiunkpe-ns-s1-1992-14586041-24126-udang-chapter1.pdf
jiunkpe-ns-s1-1992-14586041-24126-udang-chapter2.pdf
jiunkpe-ns-s1-1992-14586041-24126-udang-chapter3.pdf
jiunkpe-ns-s1-1992-14586041-24126-udang-chapter4.pdf
jiunkpe-ns-s1-1992-14586041-24126-udang-chapter5.pdf
jiunkpe-ns-s1-1992-14586041-24126-udang-conclusion.pdf
jiunkpe-ns-s1-1992-14586041-24126-udang-references.pdf
jiunkpe-ns-s1-1992-14586041-24126-udang-appendices.pdf
Similar Collection
by creator, contributor, or subject
Perencanaan kebutuhan bahan baku pada PT "X" di Surabaya
Evaluasi program pengembangan pekerja terhadap kinerja operator segmen 1180 PT E-T-A Indonesia
Peningkatan efektivitas untuk perusahaan pigura
Penjadwalan flow shop plant P dengan modified hodgson algorithm di PT X
Perencanaan dan pengendalian produksi di PT. Interkraft
Upaya penurunan jam kerja Reconstituted Tobacco (RTC) line di primary processing department PT HM Sampoerna Tbk
Implementasi sistem kanban pada mechanical assembly drawer line di PT Schneider Electric Indonesia
Analisis faktor penyebab target tidak tercapai di PT Spindo 1 unit slitter 3 dan potong plat 2