Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Prima prawn cracker factory
-
Creator(s)
(31498137) ROSALINE
(31498252) TEEDY SUSANTO WIJAYA
Contributor(s)
Pwee Leng → Advisor 1
Dewi Astuti → Examination Committee 1
Publisher
Universitas Kristen Petra; 2002
Language
Indonesian
Category
s1 – Undergraduate Thesis
Sub Category
Rancangan Usaha
Source
Rancangan usaha No. 147/EM/2002; Rosaline (31498137), Teedy Susanto Wijaya (31498252)
Subject(s)
FACTORY MANAGEMENT
PRODUCTION MANAGEMENT
File(s)
jiunkpe-is-s1-2002-31498137-47002-udang-cover.pdf
jiunkpe-is-s1-2002-31498137-47002-udang-abstract_toc.pdf
jiunkpe-is-s1-2002-31498137-47002-udang-chapter1.pdf
jiunkpe-is-s1-2002-31498137-47002-udang-chapter2.pdf
jiunkpe-is-s1-2002-31498137-47002-udang-chapter3.pdf
jiunkpe-is-s1-2002-31498137-47002-udang-chapter4.pdf
jiunkpe-is-s1-2002-31498137-47002-udang-chapter5.pdf
jiunkpe-is-s1-2002-31498137-47002-udang-chapter6.pdf
jiunkpe-is-s1-2002-31498137-47002-udang-chapter7.pdf
jiunkpe-is-s1-2002-31498137-47002-udang-chapter8.pdf
jiunkpe-is-s1-2002-31498137-47002-udang-chapter9.pdf
jiunkpe-is-s1-2002-31498137-47002-udang-conclusion.pdf
jiunkpe-is-s1-2002-31498137-47002-udang-references.pdf
jiunkpe-is-s1-2002-31498137-47002-udang-appendices.pdf
Similar Collection
by creator, contributor, or subject
Pengaruh faktor fundamental terhadap tingkat harga emas dunia
Analisis perbedaan faktor-faktor yang mempengaruhi pengambilan keputusan untuk berjual beli valuta asing antara nasabah aktif dan nasabah pasif Bank X
Peningkatan produktivitas line spion on assy dengan metode lean manufacturing di PT. FSCM Manufacturing
Peningkatan penerapan 5s di divisi persiapan pengepakan PT X
Inovasi metode pencelupan benang tenun sarung ikat di Perusahaan Sahabat Baru
Peranan material handling dalam efisiensi biaya produksi pada PT Dakar Foam Utama
Analisis pengurangan waiting time di lintasan original equipment manufacturing 1 PT Guntner Indonesia
Analisa penggunaan bahan baku filamen, faktor penyebab delay mesin lead in wire dan pembuatan rancangan sistem PPIC di PT. Cahaya Angkasa Abadi Sidoarjo