Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Analisis kinerja waktu proyek sekolah "X" dengan metode performance intensity
Author
Santoso, Andrew
Additional Author(s)
Prasetyo, Andi
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Jurusan Teknik Sipil Universitas Kristen Petra, 2013
Language
Indonesian
ISBN
-
Series
Skripsi No. 21011914/SIP/2013
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
Notes
Appendix : p. 162-174
. Bibliography : p. 161.
Abstract
-
Physical Dimension
Number of Page(s)
xxv, 174 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02576/13
(T) 658.924 San A
-
Unavailable : Removed
Similar Collection
by author or subject
Construction contracting
Perhitungan produktivitas tenaga kerja pekerjaan bekisting dengan metode level of effort
Penyiapan data harga satuan pekerjaan untuk estimasi biaya pekerjaan konstruksi baja
Harapan dan realita sistem manajemen mutu ISO 9000 dalam penerapannya di perusahaan kontraktor
Pengaruh dari faktor-faktor yang berperan dalam pemilihan project delivery system di Surabaya
Identifikasi kriteria-kriteria prakualifikasi kontraktor serta peringkatnya terhadap kualifiksi kontraktor dalam memenuhi target proyek waktu, biaya, kualitas, keselamatan kerja
Faktor-faktor yang mempengaruhi keputusan pembelian rumah dan apartemen kelas menegah bawah di Surabaya, Gresik, dan Sidoarjo
Identifikasi dan alokasi risiko-risiko pada proyek jembatan nasional Suramadu