Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Analisis kinerja waktu proyek sekolah "X" dengan metode performance intensity
Author
Santoso, Andrew
Additional Author(s)
Prasetyo, Andi
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Jurusan Teknik Sipil Universitas Kristen Petra, 2013
Language
Indonesian
ISBN
-
Series
Skripsi No. 21011914/SIP/2013
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
Notes
Appendix : p. 162-174
. Bibliography : p. 161.
Abstract
-
Physical Dimension
Number of Page(s)
xxv, 174 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02576/13
(T) 658.924 San A
-
Unavailable : Removed
Similar Collection
by author or subject
Penelitian awal tentang sisa material konstruksi pada perusahaan kontraktor di Surabaya
Building management by professionals
Studi penerapan manajemen rantai pasok pengadaan material proyek konstruksi
Pengaruh budaya keselamatan kerja pada perilaku pekerja terhadap keselamatan kerja
Kajian awal mengenai peformance intensity (momentum management) untuk mengukur kinerja waktu proyek konstruksi
Penanganan sisa material ready-mixed concrete pada proyek konstruksi
Analisa aspek-aspek dalam prosedur change order pada proyek konstruksi
Seminar sehari recent development in construction management, 28 November 1996