Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Analisis kinerja waktu proyek sekolah "X" dengan metode performance intensity
Author
Santoso, Andrew
Additional Author(s)
Prasetyo, Andi
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Jurusan Teknik Sipil Universitas Kristen Petra, 2013
Language
Indonesian
ISBN
-
Series
Skripsi No. 21011914/SIP/2013
Subject(s)
CONSTRUCTION INDUSTRY-MANAGEMENT
Notes
Appendix : p. 162-174
. Bibliography : p. 161.
Abstract
-
Physical Dimension
Number of Page(s)
xxv, 174 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02576/13
(T) 658.924 San A
-
Unavailable : Removed
Similar Collection
by author or subject
Planning and monitoring design work
Skedul kebutuhan sumber daya pada proyek sekolah dengan menggunakan program primavera
Penggunaan spreadsheet untuk pengendalian biaya pada proyek "rumah-toko"
Program perhitungan efektivitas penggunaan tower crane pada bangunan bertingkat
Studi pengaruh konsep multi customer terhadap kualitas di industri konstruksi
Sistem manajemen informasi arus kas secara terpusat (studi kasus pada PT. X )
Perencanaan dan penjadwalan sumber daya manusia pada proyek konstruksi dengan program primavera
Penanganan sisa material ready-mixed concrete pada proyek konstruksi