Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Analisa frekuensi dan besaran nilai change order serta faktor penyebabnya pada pekerjaan konstruksi bangunan tinggi
Author
Simhanandi, Ferdian
Additional Author(s)
Budiharjo, Wirawan
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Program Studi Teknik Sipil UK Petra, 2014
Language
Indonesian
ISBN
-
Series
Skripsi No. 21012006/SIP/2014
Subject(s)
CONSTRUCTION INDUSTRY MANAGEMENT
PROJECT MANAGEMENT
Notes
Appendix: p. 38 - 43
. Bibliography: p. 37.
Abstract
-
Physical Dimension
Number of Page(s)
xvii, 43 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
00552/15
(T) SIP 2006
-
Unavailable : Removed
Similar Collection
by author or subject
Last planner system terhadap performa proyek konstruksi
Penerapan metode time impact analysis pada sebuah proyek bangunan gedung bertingkat di Surabaya
Antisipasi kontraktor menghadapi faktor-faktor resiko pada kontrak lumpsum (studi kasus pada perusahaan kontraktor PT Rancang Bangun Sarana)
A Guide to the project management body of knowledge
Pengantar evaluasi proyek
Studi tentang peran pemangku kepentingan terhadap kerberhasilan bangunan hijau
Penerapan quality function deployment dalam bidang konstruksi
Penentuan buffer sizing dalam penerapan critical chain project management pada sebuah proyek konstruksi