Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Pengaturan risiko hujan dalam kontrak serta dampak dan kendalanya pada proyek konstruksi
Author
Fendy
Additional Author(s)
Handoko, Joshua Reinaldo
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Program Studi Teknik Sipil UK Petra, 2015
Language
Indonesian
ISBN
-
Series
Skripsi No. 21012017/SIP/2015
Subject(s)
CONSTRUCTION CONTRACTS
CONSTRUCTION PROJECTS-MANAGEMENT
CONSTRUCTION INDUSTRY-RISK MANAGEMENT
Notes
Appendix: p. 50-68
. Bibliography: p. 48-49.
Abstract
-
Physical Dimension
Number of Page(s)
xviii, 68 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02619/15
(T) SIP 2017
-
Unavailable : Removed
Similar Collection
by author or subject
Pengaruh tindakan tidak aman (unsafe act) dan kondisi tidak aman (unsafe condition) terhadap kecelakaan kerja konstruksi
Successful contract administration for constructors and design professionals
Pandangan kontraktor terhadap klausul-klausul kontrak pada proyek konstruksi
Produktivitas pekerja pada pekerjaan beton bertulang proyek bangunan bertingkat ( studi kasus proyek bangunan condominium TP-6 )
Faktor-faktor yang mempengaruhi kontraktor untuk mengikuti tender
Construction contracting
Understanding construction contracts
Guide for contracting, selecting and managing consultants in preconstruction engineering