Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Upaya mengurangi keterlambatan proses produksi PT. Aweco Indosteel Perkasa
Author
Yanuar, Rikky
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Program Studi Teknik Industri Universitas Kristen Petra, 2016
Language
Indonesian
ISBN
-
Series
Skripsi No. 03021876/IND/2016
Subject(s)
PRODUCTION MANAGEMENT
QUALITY CONTROL
Notes
Appendix: p. 38-43
. Bibliography: p. 37.
Abstract
-
Physical Dimension
Number of Page(s)
xii, 43 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
01021/16
(T) IND 1876
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Managing for quality in the hospitality industry
Perancangan buffer size yang optimal dalam mengatasi MRP nervousness dengan memperhatikan tingkat inflasi
Perbaikan sistem pengendalian kualitas dengan mempertimbangkan biaya kualitas di pt rejo untung abadi
Perencanaan produksi dengan mempertimbangkan kapasitas produksi pada CV. X
Pembuatan agenda qms dan modul mesin sebagai tools dalam penerapan hpwt di PT X
Peningkatan produktivitas dengan metode lean manufacturing di PT. FSCM Manufacturing
Upaya mengurangi keterlambatan produksi pada PT Gajah Tunggal Prakarsa
Pengurangan waktu lembur pada PT. Industri Kemasan Semen Gresik