Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Upaya mengurangi keterlambatan proses produksi PT. Aweco Indosteel Perkasa
Author
Yanuar, Rikky
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Program Studi Teknik Industri Universitas Kristen Petra, 2016
Language
Indonesian
ISBN
-
Series
Skripsi No. 03021876/IND/2016
Subject(s)
PRODUCTION MANAGEMENT
QUALITY CONTROL
Notes
Appendix: p. 38-43
. Bibliography: p. 37.
Abstract
-
Physical Dimension
Number of Page(s)
xii, 43 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
01021/16
(T) IND 1876
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Pedoman pelaksanaan gugus kendali mutu
Analisis waste di PT X pada departemen SCM
LKP : CV Dwi Jaya
Optimalisasi tenaga kerja pada lini produksi thimonier dan emec-tak 6 di PT Smart Tbk.
Analisa kepuasan pelanggan di Mango Terrace Restaurant dengan metode servqual
Dynamics in logistics
Analisa peranan inovasi proses terhadap produktivitas (studi kasus pada PT XYZ)
Penentuan kombinasi produk optimal PT Siar Super Feedmill