Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Penerapan value stream mapping dalam upaya mengurangi waste guna menurunkan lead time proses penerimaan barang jadi di PT X
Author
Christanto, Andreas Willy
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Jurusan Industri UK Petra, 2011
Language
Indonesian
ISBN
-
Series
Skripsi No. 01021558/IND/2011
Subject(s)
WASTE MINIMIZATION
MATERIALS HANDLING
MATERIALS-HANDLING AND TRANSPORTATION
PRODUCTION MANAGEMENT
TIME STUDY
Notes
Appendix : p. 53 - 66
Bibliography : p. 52
Abstract
-
Physical Dimension
Number of Page(s)
xiv, 66 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
03118/12
(T) 658.781 Chr P
-
Unavailable : Removed
Similar Collection
by author or subject
Operations and supply management
Principles of operations management
Pengurangan waktu proses intra transportasi menggunakan value stream mapping
Materials handling applications
Analisa produktivitas proses produksi untuk meningkatkan kapasitas produksi di departemen NCR CV Dirgahayu
Menurunkan loss time assembling drive chain dengan meningkatkan efektifitas penggunaan laporan harian operator (LHO) di PT. XYZ
Modern production/operations management
LKP : PG Rejo Agung Baru Madiun