Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Perbaikan sistem produksi dan jadwal pengirim komponen dari plant 1 menuju plant 2 pada PT. FSCM Manufacturing Indonesia
Author
Wiyogo, Edmondo Aji
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Program Studi Teknik Industri Universitas Kristen Petra, 2016
Language
Indonesian
ISBN
-
Series
Skripsi No. 01021883/IND/2016
Subject(s)
PRODUCTION MANAGEMENT
PRODUCTION SCHEDULING
Notes
Appendix: p. 70-96
. Bibliography: p. 68-69 .
Abstract
-
Physical Dimension
Number of Page(s)
xiii, 96 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02540/16
(T) IND 1883
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Pengelolaan dan pengembangan usaha pada PT. Alexander Perkasa (studi kasus pada pengelolaan produksi dan operasional)
Peranan pengembangan produk dan promosi untuk meningkatkan volume penjualan PT Sumber Yalasamudra
Penurunan total waktu dan line stop akibat abnormality pada proses dandori serta standarisasi kerja di area 1 dan 2 PT. Astra Otoparts Tbk. Divisi Adiwira Plastik
Manufacturing operations and supply chain management
Maintenance planning and scheduling
Perancangan sistem manajemen kualitas berdasarkan iso 9001:2000 di PT X di Surakarta
LKP : PT Bobo Embroidery Surabaya
LKP : PT Wijaya Indonesia Makmur Bicycle Industries Surabaya