Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Perbaikan sistem produksi dan jadwal pengirim komponen dari plant 1 menuju plant 2 pada PT. FSCM Manufacturing Indonesia
Author
Wiyogo, Edmondo Aji
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Program Studi Teknik Industri Universitas Kristen Petra, 2016
Language
Indonesian
ISBN
-
Series
Skripsi No. 01021883/IND/2016
Subject(s)
PRODUCTION MANAGEMENT
PRODUCTION SCHEDULING
Notes
Appendix: p. 70-96
. Bibliography: p. 68-69 .
Abstract
-
Physical Dimension
Number of Page(s)
xiii, 96 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02540/16
(T) IND 1883
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Organizational structure and job description development in work study department and case study in packing department at PT. Doulton
Analisa penyebab lonjakan manhours ratio pada proses fabrikasi piping dan blasting painting di PT. Gunanusa Utama Fabricators
Perbandingan sistem mutu oleh china quality certification (cqc) dengan iso 9001:2000 di PT E-T-A Indonesia
Upaya peningkatan produktivitas dengan pengukuran kapasitas dan perancangan layout di PT FSCM Manufacturing Indonesia divisi kabel
Elements of production planning and control
Manajemen operasi produksi
Peranan pengembangan produk dalam usaha meningkatkan volume penjualan pada Perusahaan XX di Surabaya
Usulan pengurangan downtime mesin oil expeller PT. Sari Mas Permai