Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Perbaikan sistem produksi dan jadwal pengirim komponen dari plant 1 menuju plant 2 pada PT. FSCM Manufacturing Indonesia
Author
Wiyogo, Edmondo Aji
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Program Studi Teknik Industri Universitas Kristen Petra, 2016
Language
Indonesian
ISBN
-
Series
Skripsi No. 01021883/IND/2016
Subject(s)
PRODUCTION MANAGEMENT
PRODUCTION SCHEDULING
Notes
Appendix: p. 70-96
. Bibliography: p. 68-69 .
Abstract
-
Physical Dimension
Number of Page(s)
xiii, 96 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02540/16
(T) IND 1883
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Penurunan bottleneck di PT. 'XYZ' dengan pendekatan simulasi
Operations management
Manajemen manufaktur dan pabrik
LKP : UD Karya Agung
Perbaikan mutu proses pengisian air ke dalam botol di PT Tirtamas Megah
Manajemen dan pengembangan fungsi produksi dan operasional pada usaha pengelahan bahan kimia PT. X di Gresik
Product design and development
Studi tentang vehicle routing problem with time windows (vrptw) dengan menggunakan metode simulated annealing