Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Perbaikan sistem produksi dan jadwal pengirim komponen dari plant 1 menuju plant 2 pada PT. FSCM Manufacturing Indonesia
Author
Wiyogo, Edmondo Aji
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Program Studi Teknik Industri Universitas Kristen Petra, 2016
Language
Indonesian
ISBN
-
Series
Skripsi No. 01021883/IND/2016
Subject(s)
PRODUCTION MANAGEMENT
PRODUCTION SCHEDULING
Notes
Appendix: p. 70-96
. Bibliography: p. 68-69 .
Abstract
-
Physical Dimension
Number of Page(s)
xiii, 96 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02540/16
(T) IND 1883
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Peningkatan output produksi dengan metode SMED di area busbar PT Schneider Electric Indonesia
Penurunan waktu weekly cleaning glue pot dan drum serta penetapan jumlah operator pada proses pembungkusan karton
Implementasi sistem pengendalian kualitas di PT Timur Selatan Pare-Kediri
Product Lifecycle Management (Volume 3): The Executive Summary
Optimalisasi layout gudang berdasarkan product family dan trend pengiriman di PT. Trias Sentosa, TBK Sidoarjo
Peningkatan jaminan kualitas assembly line TR di PT Toyota Motor Manufacturing Indonesia
Perancangan fasilitas dan metode kerja yang ergonomis di PT. Friendship.
Perencanaan kebutuhan bahan baku di PT Jaya Makmur