Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Analisis penyebab keterlambatan produksi departemen AD 2 PT. X
Author
Pontjoharyo, Jeanny
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Program Studi Teknik Industri Universitas Kristen Petra, 2018
Language
Indonesian
ISBN
-
Series
Skripsi No. 01022173/IND/2018
Subject(s)
INDUSTRIAL MANAGEMENT
PRODUCTION MANAGEMENT
Notes
Appendix: p. 34-51
. Bibliography: p.33.
Abstract
-
Physical Dimension
Number of Page(s)
xii, 51 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
03290/18
(T) IND 01-2173
Library - 8th Floor
Available
Similar Collection
by author or subject
Introduction to modern business
ERP
Advances in manufacturing
Analisa perencanaan dan pengawasan sistem produksi pada perusahaan manufaktur tas "X" di Surabaya
Peningkatan efisiensi work cell inductive sensor untuk produk sinba pada PT Schneider Electric Manufacturing Batam
Peningkatan output produksi di PT. XYZ
Beyond leadership
Maksimasi produksi aggregate plant dengan pendekatan matematis (studi kasus aggregate plant PT. Perwita Karya)