Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Analisis penyebab keterlambatan produksi departemen AD 2 PT. X
Author
Pontjoharyo, Jeanny
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknologi Industri Program Studi Teknik Industri Universitas Kristen Petra, 2018
Language
Indonesian
ISBN
-
Series
Skripsi No. 01022173/IND/2018
Subject(s)
INDUSTRIAL MANAGEMENT
PRODUCTION MANAGEMENT
Notes
Appendix: p. 34-51
. Bibliography: p.33.
Abstract
-
Physical Dimension
Number of Page(s)
xii, 51 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
03290/18
(T) IND 01-2173
Library - 8th Floor
Available
Similar Collection
by author or subject
Peningkatan produktivitas pada line final dan packing assembling 2 di PT Panggung Electric Corporation
Managerial process and organizational behavior
Perancangan dan implementasi 5S di P.T. Ekasapta Hidupmaju
Analisa quality control di pt ispatindo - sidoarjo
Upaya mengurangi keterlambatan proses produksi PT. Aweco Indosteel Perkasa
Perancangan implementasi ISO 9001:2015 di PT. Wellgan Gemilang
Operations management
LKP : PT Wijaya Indonesia Makmur Bicycle Industries