Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Analisa produktivitas pekerjaan pemancangan dan faktor-faktor yang mempengaruhinya dengan metode MPDM pada proyek X di Surabaya
Author
Tan, Felix Prasetya
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Program Studi Teknik Sipil UK Petra, 2016
Language
Indonesian
ISBN
-
Series
Skripsi No. 2102110/SIP/2016
Subject(s)
CONSTRUCTION INDUSTRY-LABOR PRODUCTIVITY
PILING (CIVIL ENGINEERING)
FOUNDATIONS
CONSTRUCTION INDUSTRY-MANAGEMENT
Notes
. Bibliography: p. 69.
Abstract
-
Physical Dimension
Number of Page(s)
xvi, 69 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02654/16
(T) SIP 2110
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Metode peningkatan daya dukung tiang dengan menggunakan pemisahan end bearing (qb) dan friction (qs) dam bulp dengan kapasitas dongkrak terbatas
Model pengendalian biaya dan resiko (pada perumahan graha famili, Surabaya)
Survey geoteknik, bagian dari KL-241 dan 242 mekanika tanah dan teknik fundasi
Hoist and elevators
Optimasi infrastruktur
Quality improvement techniques in construction
Penggunaan spreadsheet untuk pengendalian biaya pada proyek "rumah-toko"
The bearing capacity of building foundations