Physical Collection
Digital Collection
Database / E-Book
Feedback
Collection Recommendation
Satisfaction survey
Please take a moment to complete this survey below
Library's collection
Library's IT development
Cancel
Analisa produktivitas pekerjaan pemancangan dan faktor-faktor yang mempengaruhinya dengan metode MPDM pada proyek X di Surabaya
Author
Tan, Felix Prasetya
Additional Author(s)
-
Publisher
Surabaya: Fakultas Teknik Sipil dan Perencanaan Program Studi Teknik Sipil UK Petra, 2016
Language
Indonesian
ISBN
-
Series
Skripsi No. 2102110/SIP/2016
Subject(s)
CONSTRUCTION INDUSTRY-LABOR PRODUCTIVITY
PILING (CIVIL ENGINEERING)
FOUNDATIONS
CONSTRUCTION INDUSTRY-MANAGEMENT
Notes
. Bibliography: p. 69.
Abstract
-
Physical Dimension
Number of Page(s)
xvi, 69 p.
Dimension
30 cm.
Other Desc.
ill.
Summary / Review / Table of Content
No summary / review / table of content available!
Exemplar(s)
#
Accession No.
Call Number
Location
Status
1.
02654/16
(T) SIP 2110
Library - 8th Floor
Unavailable : Removed
Similar Collection
by author or subject
Studi implementasi sistem last planner pada proyek 'x' di Surabaya
Daya dukung pondasi dangkal di atas tanah berlapis
Analisa pengambilan keputusan dalam pemilihan metode bekisting pada bangunan silo di Gresik
Survey geoteknik, bagian dari KL-241 dan 242 mekanika tanah dan teknik fundasi
Pembuatan program aplikasi untuk perhitungan daya dukung dan penurunan pondasi tiang dengan menggunakan matlab
Penelitian downdrag force (negative skin friction) pada kelompok tiang pancang secara model
Evaluasi produktivitas kerja struktur kolom, balok dan plat di proyek Tunjungan Plaza 6
Prediksi kinerja waktu proyek konstruksi